9587 Baughman, Pamela J. Addendum to State Route (SR) 92 at County Road (CR) 149/Antioch Road (Rd.) and CR 308/Lockwood Rd. and SR 92 at Harp Rd. and Seay Rd.

The proposed project would improve SR 92 between and at the intersection of CR 149/Antioch Rd. and CR 138/Seay Rd in Fayette County, Georgia. The proposed improvements on SR 92 would begin approximately 1000 feet (ft.) south of the existing intersection with Lockwood Rd.

Fayette 2017
9621 Baughman, Pamela J. 2nd Addendum to the Phase 1 Archaeologcial Survey for the Widening and Reconstruction of SR 3/US 19 from CR 73/East-West County Rd. to CR 8/Atwater Rd., Upson County, Georgia

The project would widen and reconstruct SR 3/US 19 from County Road to approximately 300 feet north of CR 8/Atwater Road in Thomaston, Georgia.

Upson 2017
9686 Baughman, Pamela J. Intersection Improvements at SR 12 @ CR 700/Young Road, DeKalb County

The proposed project consists of intersection improvements at SR 12 and CR 700/Young Rd. in DeKalb County. The project will improve the skew angle of Young Road and SR 12/Covington Highway from approximately 56 degrees to more than 70 degrees.

DeKalb 2016
9726 Baughman, Pamela J. Maintenance Activities along SR 7BU from SR 7 to SR 7

The proposed project would consist of road maintenance activities along a 6.99 mile section of State Route (SR) 7 Business (BU) in Lowndes County from SR 7 to SR 7 (MP 0.00 – MP 6.99) (Figure 1).

Lowndes 2016
9727 Baughman, Pamela J. Maintenance Activities along SR 15 from the Brantley County Line to 0.15 Mile North of CR 8/Arlon Rd.

The proposed project would consist of road maintenance activities along a 21.757 mile section of State Route (SR) 15 in Pierce County from the Brantley County Line to CR 8/Arlon Rd. (MP 0.00 – MP 21.757) (Figure 1).

Pierce 2016
9756 Baughman, Pamela J. Archaeological Investigations ofthe Replacement of8 bridges over Rocky and Tobesofkee Creeks and their Overflows, Bibb County, Georgia

This report discusses the findings of the archaeological investigations undertaken for review for Georgia Department of Transportation (GDOT) Project PI 0009861.

Bibb 2016
9930 Quirk, Phillip W., Baughman, Pamela J. Addendum to Phase I Archaeological Survey of the I-285 at Bouldercrest Road Interchange, DeKalb County, Georgia

Georgia Department of Transportation (GDOT) Project IMNH0-0285-01(352), PI No.

DeKalb 2017
9962 Baughman, Pamela J. Maintenance Activities on SR 520 from West of Sears Circle to East of Morgan Circle in Nahunta, Brantley County, Georgia

The proposed project would consist of road maintenance activities along a 1.82 mile section of State Route (SR) 520 in Brantley County from Sears Circle to Morgan Circle (MP 12.756- MP 14.620) (Figure 1).

Brantley 2016
9969 Baughman, Pamela J. Addendum Survey to the Phase I for the Bridge Replacement on CR 2/Bethany Church Road at Turkey Creek Tributary, Harris County, Georgia

The proposed project involves the replacement of the existing bridge with a 120 foot (ft) long by 29.75ft wide pre-stressed concrete box beam bridge.

Harris 2017
9970 Baughman, Pamela J. Addendum Survey to the Phase I for the Bridge Replacement on CR 248/0 Street at Palmetto Creek, Harris County, Georgia

The proposed project involves the replacement of the existing bridge with an 80 foot (ft) long by 26.5ft wide pre-stressed concrete box beam bridge.

Harris 2017