Report Number Author(s) Title Abstract Summary County Year
3979 Smith, Patrick Phase I Archaeological Survey of the Proposed SR11/US129 Bridge Replacement Over the Big Tucsawhatchee Creek in Pulaski County, Georgia

On September 20, 2006, URS Corporation performed a Phase I archaeological survey of the proposed SRl 1 /US 129 bridge replacemnet over the Big Tucsawhatchee Creek in Pulaski County, Georgia.

Pulaski County, GA 2007
4050 Smith, Patrick Phase I Archaeological Survey of the Proposed SR11/US129 Bridge Replacement over Bluff Creek in Pulaski County, Georgia

On December 14, 2006, URS Corporation performed a Phase I archaeological survey of the proposed SRI 1/US 129 bridge replacement over Bluff Creek in Pulaski County, Georgia. As a result of the survey, one site and one isolated find were recorded.

Pulaski County, GA 2007
4062 Duff, Eric Anthony, Smith, Patrick Addendum to Phase I Archaeological Survey of Widening and New Alignment for Skelton Road and Memorial Park Drive

The overall project proposes to widen and improve CR 451 /Memorial Park Drive from Centennial Drive to SR 369Browns Bridge Road and extend CR 451 /Memorial Park Drive on new location to SR 53/McEver Road.

Hall County, GA 2007
4216 Smith, Patrick Addendum to Phase I Archaeological Survey of the Proposed North Avenue Intersection Improvements, Fulton County, Georgia

The purpose of this addendum is to address changes to the APE of the proposed project.

Fulton County, GA 2008
4274 Smith, Patrick Revised Phase I Archaeological Survey of the Proposed Improvements at the Intersection of SR 61, CR472/Ridge Road, and CR215/Mulberry Rock Road, Paulding County, Georgia

The purpose of this revision is to address project design changes that have occurred subsequent to the signing of the categorical exclusion.

Paulding County, GA 2008
4306 Smith, Patrick Addendum to Phase I Archaeological Survey of the Proposed Turner Lake Road and Clark Street Roundabout, Newton County, Georgia

The roundabout has an inside diameter of 100 feet, with a 10-foot wide' truck apron and a 15-foot wide travel lane. The outside shoulders would have a 24-inch curb and gutter with a 6-foot wide sidewalk and a 6-foot grass strip in all quadrants, except in the northeast quadrant.

Newton County, GA 2008
4325 Smith, Patrick Phase I Archaeological Survey of the Proposed Sigman Road Park and Ride Lot Improvements, Rockdale County, Georgia

The proposed project would consist of expanding the capacity of the existing Sigman Road park and ride lot from 416 spaces to 566 spaces and building two bus pavilion areas with shelters for commuters and bus parking for better service (see attached location map).

Rockdale County, GA 2008
4554 Smith, Patrick Revised Phase I Archaeological Survey of the Proposed Improvements at Intersection of SR 155 and Fairview Road in Henry and Rockdale Counties, Georgia

The proposed intersection improvement is part of Henry County's Special Purpose Local Option Sales Tax (SPLOST) program.

Henry County, GA 2009
4574 Smith, Patrick Phase II Testing of Site 9SP161 for the Proposed Bridge Replacement on SR 92 Over the Flint River in Fayette and Spalding Counties, Georgia

On December 10 to 14, 2007 and February 9, 2008, URS Corporation undertook Phase II limited testing of a Middle and Late Woodland site identified during the Phase I survey for the proposed bridge replacement on SR 92 over the Flint River in Fayette and Spalding Counties, Georgia.

Fayette County, GA 2009
5504 Hise, Alana, Smith, Patrick Revised Phase I Archaeological Survey of Peachtree Road, Peachtree Industrial Boulevard and Perimeter Summit Parkway Signal Design Project Areas, Dekalb County

No existing or eligible National Register archaeological resources were located within the project's area of potential environmental effect.

Decatur County, GA 1995
Displaying 41 - 50 of 57