Back to top

Smith, Patrick

Report Number Author(s) Title Abstract Summary County Year
5959 Smith, Patrick Revised Short Form for the Phase 1 Archaeological Survey of the Proposed SR 36 Bridge Replacement over the Towaliga River in Butts County, Georgia

The general project concept has not changed from that described above; however, the limits of the proposed project, including needed right-of-way and easements, have been more precisely defined since the time of the original survey.

Clarke County, GA 1994
6087 Smith, Patrick Phase I Archaeological Survey of the Proposed Widening and Reconstruction of SR 92/Dallas Acworth Highway form Old Burnt Hickory Road in Paulding County to US 41/SR 3/Cobb Parkway in Cobb County, Georgia

In April and May 2008, URS Corporation performed a Phase I archaeological survey for the proposed widening and reconstruction of State Route (SR) 92/Dallas Acworth Highway between Old Burnt Hickory Road in Paulding County and US 41/SR 3/Cobb Parkway in Cobb County, Georgia.

Cobb County, GA 2010
7285 Smith, Patrick Phase I Archaeological Survey of the Pleasant Hill Road Diverging Diamond Interchange at I-85

GDOT Project STP00-0009-00(825) proposes to create a more efficient and safer transportation facility for the citizens of Gwinnett County while meeting the capacity demands of future traffic along the Pleasant Hill Road corridor.

Jones County, GA 2002
8338 Smith, Patrick Phase I Archaeological Survey of the Proposed Thornton Road Park and Ride Lot Douglas County, Georgia

The proposed project would consist of a park and ride lot facility on a 3.78-acre site located in Douglas County, Georgia (see attached location map). The parcel is be bordered by Interstate 20 to the south, Oak Ridge Road to the east, and hotel/restaurant development to the north.

Wilkes County, GA 2013
8727 Smith, Patrick Phase I Archaeological Survey for Improvement of the Houze Road (SR 140) and Hembree Road Intersection, Roswell, Georgia

This project proposes to expand the capacity of the existing intersection to handle the existing and future traffic needs by constructing a roundabout at the intersection of Houze Road (SR 140) and Hembree Road.  The intersection improvement will also integrate the City of Roswell’s proposed

Mitchell County, GA 2011
8879 Smith, Patrick Second Addendum to Phase I Archaeological Survey of the Proposed SR 36 Bridge Replacement over the South River in Butts and Newton Counties, Georgia

The purpose of this second addendum is to address increases in needed right-of-way and easements that now extend the project limits beyond the last revised APE.

Emanuel County, GA 2001
8883 Smith, Patrick Third Addendum to Phase I Archaeological Survey of the Proposed SR 36 Bridge Replacement over the South River in Butts and Newton Counties, Georgia

This third addendum addresses a remnant parcel that is located approximately 300 meters north of the southern project corridor terminus. The project area is approximately .10 acre and will be considered a portion of the corridor’s APE.

McIntosh County, GA 2001
Displaying 51 - 57 of 57