13449
|
Larson, Lewis H., Anderson, Nain E.
|
Archaeological Assessment of Project I-75-3(66)273 Cobb County
|
This project involves widening of Interstate 75 from 285 in Cobb County north to Allgood Road in Marietta. Four more lanes would be added within the median. No additional right-of-way will be required.
|
Cobb
|
1977
|
12915
|
Anderson, Nain E.
|
Archaeological Survey Report for Project I-85-1(52)00 Harris County
|
Project 1-85-1(52)00, Harris; C.C.N. 77- 07- 25-28 involves the construction of a rest stop and tourist information center on a parcel of land south of the eastbound lane of 1-85 just east of the Alabama-Georgia State line.
|
Harris
|
1977
|
12889
|
Anderson, Nain E.
|
Archaeological Survey Report Project F-158-1(2) Harris County
|
Project F-158-1(2), Harris County; C.C.N. 77-10-07-04: This project involves the replacement of the present steel truss bridge over Mountain Oak at Lick Skillet Road in Harris County. The new bridge will be to the east of the Old bridge.
|
Harris
|
1977
|
12332
|
Anderson, Nain E., McMichael, Alan E.
|
Archaeological Survey Report, F-025-1(24), Dougherty County
|
The project was surveyed by simple visual inspection. The project area is urban with both commercial and residential property along its length. The proposed widening will require 19 feet (5.8 meters) of additional right-of-way.
|
Dougherty
|
1977
|
12107
|
Anderson, Nain E.
|
Archaeological Survey Report of APL-8019(1), Carroll County
|
This project involves the construction of a two lined facility from the intersection of S.R. 61 and U.S. 78 north .83 miles. The study corridor continues to S.R. 101. 300 feet of right-of-way will be needed. The construction will be on the right side of the right-of-way. No sites were located.
|
Carroll
|
1977
|
12047
|
Crawford, Peggy L., Anderson, Nain E.
|
M-0026(2), Clayton, Clearinghouse Doc. No. 74-03-19-06
|
This project involves widening Jonesboro Road from 2 and 3 lanes to 4 and 5 lanes. The area the project is concerned with is north from I-75 to Forest Parkway. A maximum of 50 feet of additional right-of-way will be required.
|
Clayton
|
1977
|
11789
|
Anderson, Nain E.
|
Archaeological Assessment of RF-005-1(4), Troup County
|
The project involves the widening of S.R. 18 in West Point from U.S. 29 east to 1-85 from two to four lanes. No additional right-of-way will be purchased.
|
Troup
|
1977
|
8681
|
Anderson, Nain E.
|
A parcel of land adjoining Niskey Lake Road, bisected by Brooks Road covering 43.5 acres.
|
The project will involve construction of a Middle School with various playing fields on a tract of land which is presently under pines and mixed hardwoods of a 30 to 40 year growth. The G.S.U.
|
Cherokee
|
2015
|
8668
|
Anderson, Nain E.
|
RS-0867(7) Fulton; Clearinghouse Doc. No. 75-07-30-10.
|
Location: The project involves the widening of Jonesboro Road from Goodson Road to Bethsaida Road. The section from Goodson to Oakely Road will be a 5 lane urban section, and the section from Oakley to Bethsaida Road will be a 4 lane rural section.
|
Wayne
|
2007
|
8663
|
Anderson, Nain E.
|
FF-165-1(1) , Fulton County ; Clearinghouse Doc . No . 76-11-02- 02
|
Project: FF-165-1(1), Fulton County; Clearinghouse Doc. No. 76-11-02-02.
|
Gordon
|
2010
|