Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
14474 West, Shaun E., Jenkins, Jessica, DeFrancisco, Nicole, Lanning, Bradley, Patterson, Lauren, Jackson, Paul D. A Phase I Archaeological Survey for the I-285 Westside Express Lanes, Cobb and Fulton Counties, Georgia

Cobb 2021
14475 Pappas, Andrew A., Blank, Andrew Addendum to a Phase I Archaeological Survey of the State Route 92 Realignment Corridor, Douglas County, Georgia

Project Pl Number (No.) 0006900 consists of the realignment of SR 92 from approximately 787 feet (ft) (250 meters [m)) north of the intersection of SR 92 and Malone Road to approximately 1236 ft (380 m) east of the intersection of SR 92 and the 1-20 interchange.

Douglas 2021
14476 Longacre, Emily Phase I Archaeological Survey in Advance of Sidewalk Improvements at CS 751/CR 1317/Davis Street and CS 753/Pinecrest Lane, Jackson County, Georgia

The proposed project would provide sidewalk, curb and gutter, and pedestrian lighting in the Town of Braselton along Davis Street and Pinecrest Lane.

Jackson 2021
14477 Dobbs, David Phase I Intensive Cultural Resources Survey of the Riverwatch Parking Tract

Between July 20 and 24, 2020, Brockington and Associates, Inc. (Brockington) conducted a Phase I Cultural Resources Survey for the Riverwatch Parking Tract in Richmond County, Georgia.

Richmond 2020
14478 Kosalko, Katherine Third Addendum Phase I Archaeological Survey for the Proposed SR 25 Spur East at Mackay River Bridge Replacement, Glynn County, Georgia

The proposed project would consist of replacing the existing bridge on State Route (SR) 25 Spur East (County Road [CR] 582/Torras Causeway) over the Mackay River 4.8 kilometers (km) (3 miles [mi]) east of Brunswick, Georgia (Figure 1).

Glynn 2021
14479 Perash, Rachel Phase I Cultural Resources Survey for the Relocation of Structure 48 on the Dirt Road-Riggins Mill Road 115 kV Transmission Line (Macon TMC) Project, Bond Swamp National Wildlife Refuge

On September 2, 2021, Brockington and Associates, Inc.

Twiggs 2021
14480 Abbott, David Second Addendum to the Phase I Archaeological Survey of Sigman Road Improvements, Rockdale County, Georgia

The proposed project would consist of the widening and improvements of Sigman Road (County Road [CR] 435) from east of Lester Road to Dogwood Connector in the central portion of Rockdale County, Georgia, 

Rockdale 2021
14481 Carlock, Michael D., Keef, Ashlyn Addendum to the Phase I Archaeological Resources Survey of the Proposed Bridge Replacement at County Road 157/Findley Road over I-75, Dooly County, Georgia

Dooly 2021
14482 Jennings, Lisa, Tarleton, Matthew Second Addendum Phase I Archaeological Survey for the Proposed SR 385 at Hazel Creek in Demorest Bridge Replacement, Habersham County, Georgia

The proposed project would replace the State Route (SR) 385/United States (US) 441 Business (SR 385) bridge, Structure ID 137-0006-0, over Hazel Creek in the city of Demorest, Georgia. The project length would be approximately 0.45 kilometers (km) (0.28 mile [mi]).

Habersham 2021
14483 Carey, Travis, Blackwelder, Jon R. Phase I Archaeological Survey of Pedestrian Upgrades at 21 Locations in Floyd County, Georgia

The Georgia Department of Transportation (GDOT) Project P.I. No. 0013690 is a pedestrian upgrades project for 21 locations in Floyd County, Georgia.

Floyd 2021