Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
10879 Schoeneberg, Erica Archaeological Assessment of Project STP-0000-00(648), District 3 Wide

Archaeological Assessment of Project STP-0000-00(648), District 3 Wide Project STP-0000-00(648) consists of the upgrade of signalization at 13 intersections throughout GDOT District 3 in Harris, Heard, Meriwether, Talbot, Upson, and Coweta counties.

Harris 2000
10880 McCarley, Billy J. Phase I Archaeological Survey of Harper Street Railroad Crossing Closure and Cobb Street Improvements in Fulton County, Georgia

The project proposes to close one railroad crossing (Harper Street crossing), improve another {Vine Street crossing), and widen and improve Cobb Street, all immediately adjacent to US29/SR154.

Fulton 2018
10881 Erickson, Luke W. Archaeological Assessment of a Carroll County Resurfacing Project

Archeological Assessment of a Carroll County Resurfacing Project.

Carroll 2004
10882 Pappas, Andrew A. Phase I Archaeological Resources Survey of Tallent Store Road Bridge Over Little Muckalee Creek, Sumter County, Georgia

During the course of archaeological survey, one shovel test excavated south of Tallent Store Road, within the eastern portion of the ESB was positive for cultural material (Figure 4).

Sumter 2018
10883 Erickson, Luke W. Archaeological Assessment of a Chattooga/Floyd County Resurfacing Project

Archeological Assessment of a Chattooga/Floyd County Resurfacing Project. This project consists of the resurfacing, milling, grading, and earth shoulder rebuilding on SR 100, beginning in Floyd County at SR 20 (M.P. 16.682) and ending in Chattooga County, at SR 114 (M.P. 14.20).

Floyd 2005
10884 McCarley, Billy J. Phase I Archaeological Survey for Early Acquisition Parcel 7060-001 at 2300 Old Peachtree Road, Gwinnett County, Georgia

Early acquisition parcels, as they pertain to Federal Highway Administration (FHWA) projects, are sections of land that lie within proposed Right-of-Way (ROW).

Gwinnett 2018
10885 Sipe, Ryan O. Second Addendum to Phase I Archaeological Resources Survey for the Proposed Truman Linear Park Trail Chatham County, Georgia

The proposed project is a second addendum for the Proposed Truman Linear Park Trail in Chatham County, Georgia (GDOT Project No. CSHPP0007-00(631), P.l. No. 007631, H.P. No. 110912-001) (Sipe 2015).

Chatham 2018
10886 Roberts, Joseph Tenth and Final Reevaluation of the Northwest Corridor Project, Cobb County, Georgia

Project Changes for Reevaluation 10 (February 2018): P.I. No.: 0008256. The proposed project has changed to reflect the refined design location of one proposed sound barrier along the 1-75 corridor.

Cobb 2018
10887 Price, George D. Phase I Cultural Resources Survey of the Proposed 655-Acre Blackbriar Solar Farm on Donald Cobb Road near Louisville, Jefferson County Georgia

Apalachee Research Archaeological Consultants Inc. completed a Phase I cultural resource survey on behalf of Pilot Environmental Inc. in June 2018.

Jefferson 2018
10888 Price, George D. Addendum to the Phase I Cultural Resources Survey of the Proposed Blackbriar Solar Farm on Donald Cobb Road near Louisville, Jefferson County Georgia

Apalachee Research Archaeological Consultants Inc. completed a Phase I cultural resource survey of the proposed 655-acre Blackbriar Solar Farm in Jefferson County, Georgia on behalf of Pilot Environmental Inc.

Jefferson 2018