Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
11276 Bowen, William R. Archaeological Surveys of County Bridge Projects--All Districts, BRS-1154(4), Taylor County

Georgia DOT Project # BRS-1154(4) is an in place bridge replacement prefect at SR 195 and Horse Creek in Taylor County District three. Because the project is in place, no new areas will be impacted. Only those areas which have been disturbed by previous bridge construction will be affected.

Taylor 1979
11277 Perrine, Rachel Archaeological Assessment for the Bridge Maintenance and Rehabilitation Project at State Route 1 over State Route 20 in Floyd County, Georgia and State Route 8 over the Tallapoosa River in Haralson County, Georgia

The purpose of this project is bridge maintenance and rehabilitation at the state Route (R) I northbound bridge over SR 20 westbound (Structure I D 11 5-00 12-0) in Floyd County, Georgia and at the R 8 bridge over the Tallapoosa River ( structure ID 143-0004-0) in Haralson County, Georgia (Figure

Floyd 2018
11278 Bowen, William R. Archaeological Assessment of Project MR-0133(4), Dougherty County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project MR-0133(4), Dougherty County has been surveyed with respect to archaeologica1 resources, especially those on or eligible for inclusion in the National Register of Historic Places (NRHP

Dougherty 1986
11279 Duff, Eric Anthony, Higginbotham, Brandon Archaeological Assessment of Project IM-75-2(233), Dooly County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project IM- 75- 2(233) , Dooly County has been surveyed with respect to archaeological resources , especially those on or eligible for inclusion in the National Register of Historic Places (NR

Dooly 1995
11280 Erickson, Luke W. Archeological Assessment of the Union County Resurfacing Project

Archeological Assessment of the Union County Resurfacing Project. This proposed project is 1.26 miles in length and consists of resurfacing SR 11 beginning 0.10 mile south of Shoe Factory Road (MP 12.39) and ending at SR 515 (MP 13.65). No additional right-of-way is required.

Union 2003
11281 Crawford, Peggy L. Archaeological Assessment of BHF-005-3(6), Bibb County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project BHF-005-3(6) in Bibb County has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NRHP)

Bibb 1980
11282 Bowen, William R. Archaeological Assessment of Project BRZLB-163(3), Jefferson County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project BRZLB-163 (3), Jefferson County, has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (

Jefferson 1984
11283 Crawford, Peggy L. Archaeological Assessment of Project BRZLB-0107-(6), Emanuel County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project BP~LB-0107(6), "Emanuel County has beer.

Emanuel 1981
11284 Richardson, Rick R. Archaeological Assessment of Project BRZLB-257(9), Stephens County

50’ x 22.6’ bridge with concrete abutments, steel beams and a concrete deck. Begins 500 west of Walton creek and ends 500 ft east of Walton creek. The new structure will be a 32’ x 110’ bridge. The road will be closed during construction. The county will provide detours on local roads.

Stephens 1993
11285 Paglione, Teresa L. Archaeological Assessment of Project BHF-089-1(19), Baldwin County

Bridge on SR 49 over fishing creek. No wetland involvement, no historic materials, not archaeological sites.

Baldwin 1985