Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
11626 Entorf, Robert F. Archaeological Assessment of Project BRZLB-201(11), Miller County

A proposed triple 9’ x 7’ x 36’ concrete bridge culvert. To be replaced on existing alignment. Will need 80’ of additional right of way. This road will be closed during construction.

Miller 1988
11628 Entorf, Robert F. Archaeological Assessment of Project BRS-2310(4), Pulaski County

180’ x 38’ bridge; some wetland involvement, no potentially significant archaeological resources.

Pulaski 1989
11629 Ball, Kaitlynn, DuBois, Autumn Archaeological Assessment TCNS ID #179423 Proposed 300-Foot Guyed-Type Telecommunications Structure (320-Foot Overall Height with Appurtenances) Within A 100-Foot by 100-Foot (30-Meter by 30-Meter) Lease Area Fowlstown (G8068) Off Millwhite Road Attapulgu

Environmental Corporation of America (ECA) has completed an Archaeological Assessment for the federal undertaking at the subject site.

Decatur 2018
11630 Deems, Savana, Beazley, Matthew Archaeological Assessment TCNS ID #178937 Proposed 380-foot (Overall Height with Appurtenances) Guyed Type Telecommunications Structure with Access and Utility Easements Within 100-foot by 100-Foot (30m by 30m) Lease Area Ambrose (G8040) Off Wray Road Amb

Environmental Corporation of America (ECA) has completed an Archaeological Assessment for the federal undertaking at the subject site.

Coffee 2018
11631 Entorf, Robert F. Archaeological Assessment of Project BRS-2310(3), Pulaski County

160’ x 38’ bridge; some wetland involvement, no displacements, no potentially significant archaeological resources.

Pulaski 1989
11632 Entorf, Robert F. Archaeological Assessment of Project BHF-163-1(9), Newton County

Begins at STA. 110+50.36 and ends at STA. 111+18.34 New structure is two double 101X 91 culverts.

The culvert will be staged constructed Temporary detour Temporary channel change.

Newton 1989
11633 Entorf, Robert F. Archaeological Assessment of Project BRSLB-601(2), Toombs County

Replace bridge on existing alignment with 270'x30' bridge; Widen approaches to 22 foot with 5 foot shoulders left and right from 500 prior and 500 feet past bridge; No required right-of-way or easement; Road closed during construction.

Toombs 1989
11634 Paglione, Teresa L. Archaeological Assessment of Project BRSLB-1433, Clarke County

Sta. 15+00 to Sta. 25+68.05 - 0.2 Mi . Proposed 75' ± Triple 10' x 10' Concrete Bridge Culvert. 20' of additional right of way with construction easements will be required. A run-around detour will be provided on the downstream side to keep the existing roadway open to traffic.

Clarke 1986
11635 Rotenstein, David S. Archaeological Assessment of Project BRZLB-051(4), Chatham County

Length of project .20 miles; widen bridge approaches to 24 feet and construct a 28 foot wide bridge. No detour.

Chatham 1985
11636 Richardson, Rick R. Archaeological Assessment of Project BRZLB-137(18), Habersham County

Begins approximately 600’ north of Southern Rail road and ends 400’ north and south of the intersection of CK 97 and CR 96. New structure will be 200’ long and 24’ wide. Road will be closed during construction.

Habersham 1993