Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
14138 Pope, Natalie Adams, Olin, Susan Phase I Archaeological Survey of Proposed Improvements to Two Intersections on SR 225 at SR 52 ALT and Spring Place Smyrna Road, and Phase II Testing of 9MU199 and 9MU201; Murray County, Georgia GDOT PI No. 631550, Project No. STP00-0151-01(005)

The Georgia Department of Transportation (GDOT) plans to improve the intersections of SR 225 at SR 52 ALT and Spring Place Smyrna Road in Murray County (Project No.

Murray County, GA 2018
14139 Newman, Joshua, Handley, Brent M. A CULTURAL RESOURCE ASSESSMENT SURVEY OF THE TAYLORSVILLE WT MONOPOLE TOWER, POLK COUNTY, GEORGIA TCNS #210966

In June 2020, Environmental Services, Inc.

Polk County, GA 2020
14140 Newman, Joshua, Handley, Brent M. A CULTURAL RESOURCE ASSESSMENT SURVEY OF THE ROCKMART WT MONOPOLE TOWER, POLK COUNTY, GEORGIA TCNS #210965

In June 2020, Environmental Services, Inc.

Polk County, GA 2020
14141 Gresham, Thomas H. Archeological Survey of the Proposed Ronald Reagan Boulevard, Forsyth County, Georgia

Forsyth County plans to construct a 2.0 km (1.25 mi) long, four-lane divided roadway between Union Hill Road and McFarland Road, just southeast of SR 400 in extreme southern Forsyth County.

Forsyth County, GA 2007
14142 Fox, Ben Archeological Testing for the Proposed Relocation of Structure 48, Union City-South Griffin 230 kV Transmission Line, Fayette County, Georgia

The area where transmission line structure (# 48) is to be relocated was archeologically surveyed on August 21, 2007 by Chad O. Braley of Southeastern Archeological Services, Inc.

Fayette County, GA 2007
14143 McCarley, Billy J. Phase I Archaeological Survey of the Proposed Smith RD-D Telecommunications Facility in Rayle Wilkes County, Georgia

Subterranean Consultants (STC) conducted a Phase I archaeological survey of the Smith RD-D telecommunication facility lease area and access/utility easement on July 2, 2020.

Wilkes County, GA 2020
14144 McCarley, Billy J. Phase I Archaeological Survey of the Proposed Spud-B Telecommunications Facility in Barnesville Lamar County, Georgia

Subterranean Consultants (STC) conducted a Phase I archaeological survey of the Spud-B telecommunication facility lease area and access/utility easement on July 3, 2020.

Lamar County, GA 2020
14145 McCarley, Billy J. Phase I Archaeological Survey of the Proposed SR Laurel Branch-A Telecommunications Facility in Gordon, Wilkinson County, Georgia

Subterranean Consultants (STC) conducted a Phase I archaeological survey of the SR Laurel Branch-A telecommunication facility lease area, turn-around, and access/utility easement on June 15, 2020.

Gordon County, GA 2020
14146 Gresham, Thomas H. Locust Road Distribution Line Extension, Butts and Henry Counties, Georgia

By this letter I am reporting to you the results of an intensive, Phase I archeological survey that Southeastern Archeological Services, Inc.

Butts County, GA 2016
14147 Benson, Robert W. Phase I Archeological Survey of the Pleasant Hill Distribution Line Modification for Amicalola EMC in Northwestern Gilmer County, Georgia

This report presents the results of an intensive archeological survey conducted by Southeastern Archeological Services, Inc. (SAS) in northwestern Gilmer County, Georgia, Amicalola EMC wishes to construct approximately 5.3 km (3.3 mi) long distribution line.

Gilmer County, GA 2019