Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
14584 Chieffo, Anthony Phase I Archaeological Survey of the Proposed SR 85 Improvements from SR 279 to CR 820/Roberts Drive, Fayette and Clayton Counties, Georgia – USACE Section 106 Report

The proposed GDOT project would widen State Route (SR) 85 from just south of SR 279 in Fayette County to approximately 216.4 meters (m) (710 feet [ft]) north of Bethsaida Road/Lamar Hutcheson Parkway in Clayton County.

Fayette 2021
14585 Pietak, Lynn Marie, Roberts, Joseph PHASE I ARCHAEOLOGICAL SURVEY OF I-85 AT SR 138/JONESBORO ROAD INTERCHANGE RECONSTRUCTION AND WIDENING, FULTON COUNTY, GEORGIA

A Phase I archaeological survey was conducted between July 2015 and June 2018 of the proposed Interstate (I-) 85 at State Route (SR) 138 Jonesboro Road interchange widening and reconstruction by Edwards-Pitman Environmental, Inc.

Fulton 2019
14586 Banguilan, Sarah Cole Phase I Archaeological Resources Survey of the Proposed SR 37 Roundabout, Colquitt County, Georgia

In January 2018, Vanasse Hangen Brustlin, Inc. (VHB) conducted a Phase I archaeological survey of the proposed State Route (SR) 37 roundabout located in Colquitt County, Georgia, within the city limits of Moultrie (PI No. 0009855).

Colquitt 2018
14587 Pappas, Andrew A. Phase I Archaeological Survey of the CR 168/James Rogers Road Bridge Replacement Over Hardage Ford Creek, Marion County, Georgia

In March and November of 2019, Vanasse Hangen Brustlin (VHB), Inc.

Marion 2020
14588 Pappas, Andrew A. Phase I/II Archaeological Resources Survey of State Route (SR) 186/High Shoals Road Bridge Replacement Over the Apalachee River, Morgan, Oconee, and Walton Counties, Georgia.

In June and July of 2018 and June 2020, VHB completed a Phase I/II archaeological resources evaluation and testing of the State Route (SR) 186/High Shoals Road bridge replacement over the Apalachee River 

Morgan 2021
14589 Carlock, Michael D. Addendum Phase I Archaeological Resources Survey of the Proposed West Lake Avenue Bridge Replacement Over the CSX/MARTA Railroad, Fulton County, Georgia

This document addresses new changes to Georgia Department of Transportation (GDOT) PI No.

Fulton 2021
14590 Kosalko, Katherine PHASE I ARCHAEOLOGICAL SURVEY FOR THE PROPOSED BRIDGE REPLACEMENT AT SR 1/US 27 OVER FLAT SHOAL CREEK, TROUP COUNTY, GEORGIA

Edwards-Pitman Environmental, Inc.

Troup 2020
14591 Pappas, Andrew A. : Phase I Archaeological Resource Survey of the County Road (CR) 283/Bar Bridge Road Bridge Replacement Over Murder Creek, Jasper County, Georgia

In March 2020, Vanasse Hangen Brustlin, Inc.

Jasper 2020
14592 Perrine, Wesley A. Phase I Archaeological Survey for the Fall Line Freeway/ State Route 24, Washington County, Georgia – USACE Section 106 Report

The proposed project would consist of the widening of State Route (SR) 24 in Washington County east of Chambers Brooks Spring Road to west of Helton Lane for approximately 1.85 miles.

Washington 2019
14593 Campbell, Elizabeth Chance Phase I Archaeological Survey of the Proposed State Route 92 and Butner Road Roundabout Project, Fulton County, Georgia

AECOM Technical Services, Inc. (AECOM) conducted fieldwork for the Phase I archaeological survey of the proposed State Route (SR) 92 and Butner Road roundabout in Fulton County, Georgia.

Fulton 2020