Report Number Author(s) Title Abstract Summary County Year
3898 Joseph, Joseph W. Phase I Archaeological Survey of the Gravel Springs Road Widening Project, Gwinnett County, Georgia

Project Description:

Gwinnett 2007
3899 Joseph, Joseph W. Review of Minor Changes to the Interstate 75 and Jodeco Road Intersection, Henry County, Georgia

Project Description:

Henry 2007
3900 Gale, Sara H. Archaeological Survey BRZLB-1790(6), Mitchell County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project BRZLB-1790(6), Mitchell County, has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (N

Mitchell 2007
3901 Gale, Sara H. Archaeological Survey of Project BRS-1615(3), Colquitt County

This project will replace the existing bridge over Warrior Creek located on SR 256/Scooterville Highway located approximately 2 miles north of Norman Park. The existing 315 ft by 28 ft concrete/steel bridge will be replaced with a 400 ft by 38 ft concrete bridge on the existing alignment.

Colquitt 2007
3902 Johnson, Pamela A. Archaeological Assessment of Project CSNHS-0008-00(458), Cook County

CSNHS-0008-00(458) proposes work to reconstruct the existing CR 246/Kinard Bridge Road intersection with 1-75 in Cook County, Georgia. The APE for this project was originally surveyed by Edwards-Pitman Environmental, Inc. (EPEI) in June 2006 as part of project NHS-0000-00(764).

Cook 2007
3903 Duff, Eric Anthony Archaeological Assessment of a Flex Shoulder Lane Project, Fulton and Forsyth Counties

The proposed project would install a Flex Shoulder Lane along US 19/SR 400 between Spalding Drive and McFarland Road. The project will be constructed utilizing the existing bus lane, as well as the existing 12 foot shoulder.

Forsyth 2007
3904 Koch, Christopher P. Addendum Archaeological Survey of Proposed Bridge Replacement on SR 100 over Clear Creek, Heard County, Georgia

At the request of Georgia Department of Transportation, Terracon conducted a Phase I Archaeological Survey of two proposed Georgia Department of Transportation bridge replacement projects (BRST-2797 (4)) at Clear Creek and New River.

Heard 2007
3905 Pietak, Lynn Marie Phase I Archaeological Survey of Proposed Improvements to Sr 105/US 441 Business Route, Habersham County, Georgia

The proposed project is located along SR 105 beginning at the Cannon Bridge Road intersection approximately one mile west of the existing interchange at SR 365, near the city of Cornelia, in Habersham County.

Habersham 2007
3906 Lotti, Teresa Ann Archaeological Reassessment of Project STP-004-2(31), Jones County

Project STP-004-2(3 1) would construct the Gray Bypass in Jones County. This proposed project was subjected to three previous archaeological surveys: September 2000 and July 2001 by Southeastern Archeological Services, Inc.

Jones 2007
3907 Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of the West End Historic District Livable Center Initiative, Fulton County, Georgia

This addendum includes the results of the archaeological survey for project STP-0004-00 (463) [see attachment for current project description and explanation of project changes]; the area of potential effect includes a new segment of Lowery Boulevard south of 1-20.

Fulton 2007