Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
3968 Johnson, Pamela A. Archaeological Assessment of Project CSSTP-0006-00(476), Dodge/Laurens County

Archaeological Assessment of Project CSSTP-0006-00(476), Dodge/Laurens County.

Dodge 2007
3969 Joseph, Joseph W. Review of Minor Changes to the Bloomfield Road Corridor, Macon, Bibb County, Georgia

Project Location and Area of Potential Effect: County(ies): Bibb; USGS Quadrangle(s) Macon West; Project Description: The project consists of an extension of the original Bloomfield Road corridor onto Rocky Creek Road which intersects Bloomfield Road at its southern terminus.

Bibb 2007
3970 Gresham, Thomas H. An Archaeological Survey for the Proposed Traffic Signal Upgrades in Chatham, Effingham, and Evans Counties, Georgia

Project Location and Area of Potential Effect- Counties: Chatham, Effingham, and Evans; USGS Quadrangles: Garden City, Springfield South, and Claxton.

Chatham 2007
3971 Pietak, Lynn Marie Phase I Archaeological Survey of Henry and Butts Counties Signal Upgrade Project Areas

Project Location and Area of Potential Effect County(ies): Henry & Butts. USGS Quadrangle(s): Jackson, McDonough, Stockbridge Project Description: The proposed project would consist of traffic signal upgrades at four intersections within Henry and Butts Counties, Georgia.

Butts 2007
3972 Duff, Eric Anthony Archaeological Assessment of Project CSNHS-M003-00(674), Ware County

Archaeological Assessment of Project CSNHS-M003-00(674), Ware County.

Ware 2007
3973 Joseph, Joseph W. Phase I Archaeological Survey of the SR 360 Corridor

New South Associates conducted a Phase I Archaeological Survey of the SR 360 corridor between SR 120 in Paulding County and SR 176/New Macland Road in Cobb County on October 24 through November 7, 2006 (Figure 1).

Cobb 2007
3974 Pietak, Lynn Marie Phase I Archaeological Survey of the Proposed Hayden Quarry Road Extension, Dekalb and Rockdale Counties, Georgia

During March 2007, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed corridor for the Hayden Quarry Road Extension project. The project corridor is located in Dekalb and Rockdale Counties, Georgia, and is approximately 1.8 miles in length.

DeKalb 2007
3975 Tucker, Emily Kate, Wild, Michael J. Cultural Resource Survey for the Proposed Center Point-Moss Lake Transmission Line, Gordon and Whitfield Counties, Georgia

Management Summary- TRC was contracted by TVA to conduct a cultural resources survey of a proposed 15.5 mile 230/115-kV transmission line in Gordon and Whitfield counties, Georgia, which will proceed from the Center Point Substation south of Dalton to a future substation site east of Calhoun.

Gordon 2007
3976 Braley, Chad O. An Archaeological Reassessment of the Proposed SR 307 Overpass, Chatham County, Georgia

The proposed project includes the construction of a new bridge on existing SR 307 approximately 1350 ft west of the intersection of SR25 in Garden City, Georgia.

Chatham 2007
3977 Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of the Chapel Hill Road at Douglas Road/Timber Ridge Drive Intersection Improvements, Douglas County, Georgia

Revised Project Description for GDOT Project CSSTP-0006-00(902), P.I.

Douglas 2007