6485 Entorf, Robert F. Archaeological Assessment of Project STP-104-1(44), Forsyth County

The proposed project consists of the widening of SR 141 at CR 50 (Sharon Road) in order to add a left turn lane for the southbound traffic on SR 141 in Forsyth County. The existing right-of-way on SR 141 is approximately 30.5 m (100 ft).

Clinch 1995
6486 Entorf, Robert F. Archaeological Assessment of Project STP-065-3(50) Forsyth County

The proposed project consists of the widening of SR 53 at CR 226 (Westbrook Rd./Crystal Cove Rd.) in order to add turning lanes for SR 53 north and southbound traffic. The existing right-of-way on SR 53 is approximately 30.5 m (100 ft). The existing right-of-way on CR 266/Westbrook Rd.

Clinch 1996
6487 Duff, Eric Anthony Archaeological Assessment of Project PR-8530(117), Forsyth County

Project PR-8530(117) allows for widening, grading, drainage, base and surfacing on Kelly Mill Road in the city of Cumming. The proposed project on Kelly Mill Road would begin approximately 161 meters (528 feet) east of Jason Drive then continue easterly to an end point at West Maple Street.

Cobb 1995
6488 Richardson, Rick R. Archaeological Assessment of Project STP-2879(2), Forsyth County

The proposed project would improve the existing intersection of State Route 306 and County Road 201 by widening the approaches to the intersection for a total distance of approximately 0.7 km (0.45 mi). The existing right-of-way for State Route 306 is approximately 24.4 m (80 ft).

Cobb 2001
6489 Entorf, Robert F. Archaeological Assessment of Project SR-2704(4), Forsyth County

The proposed project would reconstruct and widen Pirkle Ferry Road and Maple Street in Cumming. The project as proposed would begin at S.R. 9 then would extend easterly along Pirkle Ferry Road and Maple Street to a point approximately 500 feet west of S.R. 400.

Cobb 1991
6490 Paglione, Teresa L. Archaeological Re-evaluation of Project FR-104-1(39)

The proposed project would widen and reconstruct State Route 141 for approximately 6.2 miles, beginning approximately 0.6 mile north of McGinnis Ferry Road and ending at the SR 141 and SR 9 intersection.

Cobb 1987
6491 Bowen, William R. Archaeological Assessment of Project EDS-460(2), Forsyth/Gwinnett County

Proposed project is the construction of a Park and Ride lot southeast of the intersection of Bethleview Road/Georgia Highway 141 and S.R. 9. The project will begin just south of Bethleview Road/Georgia Highway 141 and extend southwesterly along the east side of S.R.

DeKalb 1987
6492 Bowen, William R. Archaeological Assessment of Project BRZLB-117(6)

This project proposes to replace the existing bridge with a concrete bridge culvert slightly upstream from the existing. A corridor 1500 feet long and from about 80 to 140 feet wide was surveyed for the project.

Fulton 1987
6493 McIntosh, Paul Archaeological Assessment of Project MLP-0001-00(980), Forsyth County

The proposed project would widen SR 369 between SR 9 and SR 400 by an additional lane. The existing right-of-way along SR 369 is approximately 100 feet. All project construction would be take place within existing right-of-way.

Cobb 1996
6494 Pomfret, James Archaeological Survey of Project STP-056-1(67), Forsyth County

The proposed project would reconstruct the intersection of State Route 400 and County Road 1.76 in Forsyth County. The proposed project would move the median cross-over 69 feet south and realign County Road 176 from 61.2 degrees to 75 degrees.