Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
6525 Paglione, Teresa L. Archaeological Assessment of Project FR-037-2(54), Clayton County

The proposed project is the widening and reconstruction of SR 42/US 23. The, project begins just north of Lake Harbin Road and ends just south of Anvil Block Road. The existing railroad overpass would be removed. Existing right-of-way is 80 feet; required right-of-way is 100 feet.

Cherokee 2001
6526 Archaeological Assessment of Project FR-037-2(44), Clayton County

The proposed project would reconstruct and widen S.R. 42/Macon Highway in Clayton County. The project would begin approximately 600 feet north of Lake Harbin Road intersection then would extend southeasterly along existing S.R.

Cobb 2001
6527 Paglione, Teresa L. Archaeological Assessment of Project FR-037-2(54), Reevaluation Clayton County

The proposed project originally consisted of the widening and reconstruction of SR 42/US 23. The project would begin just north of Lake Harbin Road and ends just south of Anvil Block Road. The existing railroad overpass would be removed.

Cobb 2002
6528 McIntosh, Paul Archaeological Assessment of Project BRSLB-9110(4), Clayton County

The proposed project would consist of replacing the bridge spanning Little Cotton Indian Creek along CR 1351/Rex Road in Clayton County. The bridge will be replaced on new location, approximately 540 feet downstream of the existing structure.

Fulton 2002
6529 Paglione, Teresa L. Archaeological Assessment of Project MR-9103(5), Clayton County

The proposed project consists of the widening and reconstruction of Panola Road/CR 1349 beginning at the intersection of Bouldercrest Road and ending at the intersection of Stagecoach Road. The existing right-of-way is 80 feet; the required right-of-way would be 110 feet.

Columbia 1948
6530 Paglione, Teresa L. Archaeological Assessment of Project MR-9108(4), Clayton County

Project MR-9108(4) consists of the widening and reconstruction of Mount Zion Boulevard from Battlecreek Road to Lake Harbin Road.

Elbert 1948
6531 Pomfret, James Archaeological Assessment of Project STP-7318-00(850), Clayton County

The proposed project represents the proposed traffic operation improvements to SR 85 from SR 231 to Pointe South Parkway and SR 138 from SR 85 to North Avenue.

Cobb 2000
6532 McIntosh, Paul Archaeological Assessment of Project BRF-001-4(57), Clayton County

The proposed project would consist of replacing the bridge spanning the Central of Georgia Railroad along US 19/SR 3/ Old Dixie Highway in Clayton County. The existing bridge is a 350' X 52.2' concrete structure, and will be replaced with a 350' X 66' concrete structure on existing alignment.

Cobb 1995
6533 McIntosh, Paul Archaeological Assessment of Project CM-75-2(214), Clayton County

The proposed project consists of expansion of the NAVIGATOR system on 1-75 in Clayton County, from approximately one mile south of the 1-285 South/I-75 exit southward to US 19/41/Tara Boulevard. Total length of this project is 3.53 miles. All work will be done within the existing right-of-way.

Cobb 2005
6534 McIntosh, Paul Archaeological Assessment of Project STP-074-2(39), Clayton County

The proposed project would consist of reconstruction of median crossovers along SR 85 at various locations in Clayton County. The project begins at the Clayton County/Fayette County Line and proceeds northward to CR 304/Hillside Drive, approximately 1.68 mile north of the Riverdale City Limits.

Cobb 2005