Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
6555 Entorf, Robert F. Archaeological Assessment of Project STPN-001-4(51), Clayton County

The proposed project would consist of the improvement of the median at the - 75/Tara Boulevard .interchange in Clayton County. These improvements would include landscaping, sign installation, and construction of a wall with columns upon it within the area of the median.

Fulton 1977
6556 Entorf, Robert F. Archaeological Assessment of Project STP-00MS(77), Clayton County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project STP-OOMS (77), Clayton County has been surveyed with respect to archaeological resources, especially those on or eligible f or inclusion in the National Register of Historic Places (N

Gilmer 1972
6557 Duff, Eric Anthony Archaeological Assessment of Project STP-074-2(38), Clayton County

The proposed project will involve the aerial installation, of a fiber optic communication cable along SR 85. The project begins at Forest Parkway and ends at Point. South Parkway for a distance of approximately 11.3 km (7 mi). The cable is to be installed on existing Georgia Power poles.

Gilmer 1977
6558 Duff, Eric Anthony Archaeological Assessment of Project CM-00TS(12), Clayton County

The proposed project would involve the installation of route surveillance and monitoring devices at various locations in Clayton County. These are: South n St.; Jonesboro Rd.; SR 54; Old Dixie Rd.; Tara Blvd.; Upper Riverdale Rd.; Valley Hill Rd.; SR 85; Aviation Blvd.; Mt. Zion Blvd.; Mt..

Clayton 1978
6559 Duff, Eric Anthony Archaeological Assessment of Project MLP-3(243), Henry-Clayton Counties

The project is the proposed widening of the outside northbound lane on SR 3/US 19 & 41 due to substandard depth.

DeKalb 1973
6560 Fernandez-Sardina, Ricardo Archaeological Assessment of Project NH-001-4(53), Clayton County

The proposed project would widen S.R. 3/Tara Blvd. by adding one 3.6 m. (12') lane on the outside northbound side. Project begins 320 m. (1050') south of Morrow Industrial Blvd., and continues along Old Dixie Highway to Upper Riverdale Road. Total project length is approximately 1.2 km.

Fulton 1973
6561 Fernandez-Sardina, Ricardo Archaeological Assessment of Project STP-9103(6), Clayton County

The proposed project consists of the re-alignment of Forest Parkway/S.R. 331 at Germain Industrial Court. Project would begin approximately 268 m. (878') west of Germain Ind. Ct. and end approximately 464 m. (1521') east of the same, for a total project length of 0.7 km. (0.445 miles).

Columbia 1993
6562 Fernandez-Sardina, Ricardo Archaeological Assessment of Project STP-074-2(30), Clayton County

The proposed project consists of intersection improvements at S.R. 85, S.R. 138 and 1-75 on ramps. Additional right-of-way of 6 m. (20') would be required on the west side of S.R. 85 beginning at International Blvd. and extending approximately 120 m. (400') north, ending in a taper.

Columbia 1997
6563 Fernandez-Sardina, Ricardo Archaeological Assessment of Project STP-074-2(28), Clayton County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto project STP-074-2(28), Clayton County has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NRH

Columbia 1992
6564 Fernandez-Sardina, Ricardo Archaeological Assessment of Project STP-074-2(29), Clayton County

The proposed project consists of the widening of Valley Road at S.R. 85. Project begins at intersection with S.R. 85 and extends 487.7 m. (1600') east on Valley Hill Rd. Existing right-of-way varies from 30 m. (100') to 25.6 m.

Columbia 1990