Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
6595 Smith, Marion F., Taylor, Richard L. Preliminary Results of the Intensive Survey of the Proposed Richard B. Russell Dam and Lake Project, Georgia and South Carolina

None Present.

Newton 1985
6596 Pendergrast, Britt Anthony Shoals a Preliminaty Feasibility Study on its use as a Conservation Park and Water Access Site

The Feasibility Study on Anthony Shoals is prepared as a base of information and recommendations upon which policy makers can base decisions on acquisition, use, development and management of the site.

Wilkes 1975
6597 Fryman, Robert J. Phase I Cultural Resource Survey of the Proposed Widening of U.S. Highway 441 in Dodge, Laurens, and Wheeler Counties, Georgia

This Phase I cultural resource survey was performed by Garrow & Associates, Inc., under contract with Greenhorne & O'Mara, Inc., prior to the proposed widening of U.S. Highway 441.

Rockdale 1985
6598 Hicks, Lacey M., Whitley, Thomas G. Cultural Resources Survey for the Proposed Spout Springs Substation, Hall County, Georgia

An intensive cultural resources survey was carried out for the proposed Spout Springs Substation in Hall County, Georgia. The project was carried out in compliance with Section 106 of the National Historic Preservation Act by personnel qualified under 36 CFR Part 61.

Newton 1988
6599 Smith, Greg C. A Cultural Resource Assessment Survey for the Proposed FSL Landfill, Forsyth County, Georgia

In April 1996, a cultural resource assessment survey was conducted of an undeveloped tract (approximately 500 acres) above the western floodplain of the Etowah River in Forsyth County, Georgia.

Forsyth 1996
6600 Gresham, Thomas H. Cultural Resources Survey of the Proposed South Hall-Spout Springs 230 kV Transmission Line and Substation, Hall County, Georgia

In September, 2000 Southeastern Archeological Services, Inc., conducted a Phase I archeological and historic resources survey of a proposed 12.9 km (8.0 mi) long transmission line corridor and a 7.7 ha (19 ac) substation tract in southern Hall County, Georgia.

Newton 1989
6601 Webb, Robert S. Tallulah Lodge-Helen Proposed Transmission Line White and Habersham Counties, Georgia

Between September 1983 and November 1984, Robert Webb, Robert Hunter and Keith Reiner of CTA Environmental, Inc.

Newton 1994
6602 Schneider, Kent A. An Archeological Survey of a Proposed 20-Acre Fireplace - Rock Removal Area, Chattooga Ranger District, Chattahoochee National Forest, Georgia

On December 23, 1976, a 20-acre portion of compartment 242 was examined for the presence of cultural resources prior to the letting of a permit authorizing removal of rock for fireplace construction.

1977
6603 Gresham, Thomas H. A Cultural Resources Survey of the Proposed Kettle Creek Substation and Wilsonville-Kettle Creek Transmission Line, Ware and Coffee Counties, Georgia

Oglethorpe Power Corporation contracted with Southeastern Archeological Services, Inc. to conduct an intensive cultural resources survey of a proposed 37.7 km (23.4 mi) transmission line and 10.9 ha (27 ac) substation in Ware and Coffee Counties, Georgia.

Newton 1994
6604 Meier, Lawrence W. Report of Archeological and Historical Survey Chattooga Ranger District White and Habersham Counties, Georgia Chattahoochee National Forest

The research area for the above project is located on the Dahlonega Plateau of the upper Piedmont Province of Georgia (McCallie, et al.,1925). The.

Newton 2001