1072 |
Baldwin, Geraldine E., Fryman, Robert J. |
Cultural Resources Survey of the 5.51 Acre Tract for the 115/12 Kv Sandy Plains Substation: Cobb County, Georgia |
This report documents the results of the Phase I cultural resources survey performed on the 5.51 acre area to be impacted by the construction of the proposed Sandy Plains 115/12 kV Substation. |
Cobb County, GA |
1993 |
1145 |
Fryman, Robert J. |
Phase I Archaeological Survey of the Proposed Eastman-North Dublin Transmission Corridor |
This report documents the Phase I cultural resource survey of the proposed development of the Eastman-North Dublin 230 kV transmission line loop for Oglethorpe Power Corporation. The 12 acre study tract is located 1.25 miles west of Dublin, in north-central Laurens County, Georgia. |
Laurens County, GA |
1993 |
1191 |
Fryman, Robert J., Stoops, Richard W. |
Phase I Archaeological Survey of the Colony Homes Development Area |
This report documents the findings of a Phase I archaeological survey of the proposed Colony Homes development area. This development tract encompasses approximately 950 acres and is located in the north Georgia Piedmont in the southeastern corner of Paulding County. |
Paulding County, GA |
1994 |
1282 |
Fryman, Robert J. |
Phase I Cultural Resources Survey of a 76.83 Acre Tract, Lamar County, Georgia |
A cultural resources survey was conducted in Lamar County, Georgia, by Garrow & Associates, Inc. of Atlanta for Raytheon Service Company. |
Lamar County, GA |
1992 |
1300 |
Fryman, Robert J., Stanyard, William F. |
Phase I Survey of the Proposed Western Dam Abutment Access Road for the Big Haynes Reservoir, Rockdale County, Georgia |
This report details the results of the Phase I survey of the proposed western dam abutment access road for the Big Haynes Reservoir. |
Rockdale County, GA |
1993 |
1327 |
Fryman, Robert J., Britt, Tad |
Phase I Cultural Resource Survey of the Proposed Sunset-Tallokas 46 Kv Aerial Transmission Line Corridor (Phase II 14,500 Feet) Colquitt County, Georgia, Phase II Addendum |
This report addendum documents the results of a cultural resource survey conducted between February 14 and 15, 1994 by Garrow & Associates, Inc. for the Phase 2 section (14,500 feet) of the proposed Sunset-Tallokas 46 kV aerial transmission line. |
Colquitt County, GA |
1994 |
1504 |
Fryman, Robert J. |
Data Recovery of the Confederate Entrenchments at Site 9Co352, Barrett Parkway Extension Project, Cobb County, Georgia |
Data recovery efforts were conducted from November 15 to December 9, 1994, on site 9C0352, located in Cobb County, Georgia, by Garrow & Associates, Inc., on behalf of the Cobb County Department of Transportation. |
Cobb County, GA |
1996 |
1611 |
Fryman, Robert J., Lilly, Thomas G. |
Phase I Cultural Resources Survey of the Proposed Banks County Landfill Site on Carlan Creek in Banks County, Georgia |
This Phase I survey was performed by Garrow & Associates, Inc. under contract with Chambers Development Company, Inc. in order to identify any cultural resources situated within the proposed Banks County landfill site on Carlan Creek in Banks County, Georgia. |
Banks County, GA |
1993 |
1675 |
Fryman, Robert J. |
Phase I Archaeological Survey of the Proposed Haw Creek Substation and Transmission Line Corridor, Forsyth County, Georgia |
Historic Preservation Consulting recently completed a Phase I archaeological survey of the proposed Haw Creek Substation and Transmission Line Corridor in southeastern Forsyth County, Georgia. The work was conducted for Georgia Transmission Corporation. |
Forsyth County, GA |
1998 |
1851 |
Fryman, Robert J. |
Phase I Archaeological Survey of the Proposed Suwanee-Old Atlanta Transmission Line, Gwinnett County, Georgia |
Historic Preservation Consulting recently completed a Phase I archaeological survey of the proposed Suwanee Old Atlanta 11 5kV Transmission Line Corridor in Gwinnett County, Georgia. |
Gwinnett County, GA |
1998 |