Report Number Author(s) Title Abstract Summary County Year
6445 Fernandez-Sardina, Ricardo Archaeological Assessment of Project STP-054-1(49), Gwinnett County

The proposed project would add a left turn lane southbound on SR 20/Buford Highway at the intersection with SR 324/Hog Mountain Road, widening on the east side. Widening would occur within the existing 80 feet right of way.

Glynn 1986
6446 Lotti, Teresa Ann Archaeological Assessment of Project STP-0003-00(406), Gwinnett County

STP-0003-00(406) would consist of the elimination of the reversible lane system along US 78 from East Park Place Boulevard to SR 124 in Gwinnett County. The proposed project would change the lane configuration to three lanes in each direction with a center concrete median.

Glynn 1995
6447 Lotti, Teresa Ann Archaeological Assessment of Project NHS-0001-00(378), Gwinnett County

Project NHS-0001-00(378) would consist of constructing a multi-use pedestrian facility, which would include pedestrian ramps and a pedestrian bridge over Ivy Creek, along the west side of SR 20 through the 1-85 Interchange in Gwinnett County.

Glynn 1995
6448 Entorf, Robert F. Archaeological Assessment of Project CM-00TS(37), Gwinnett County

The proposed project would involve the installation of route surveillance cameras along Jimmy Carter Boulevard/ Holcomb Bridge Road in Gwinnett County. Also included would be the installation of fiber optic cables in the project corridor.

Glynn 1994
6449 Richardson, Rick R. Archaeological Assessment of Project STP-0910(11), Gwinnett County

The proposed project would correct the existing horizontal alignment on SR 324 at CR 211 (Location 1) and CR 203 (Location 2).

McIntosh 1994
6450 Schoeneberg, Erica Archaeological Assessment of Project IM-00MS(370), Gwinnett County

Proposed project IM-OOMS(370) in Gwinnett County proposes to make improvements to the 1-85 and SR 317 interchange. The 1-85 ramp improvements would begin approximately 2274 feet south, of SR 317 and end at a point approximately 2477 feet north of SR 317.

Glynn 1995
6451 Schoeneberg, Erica Archaeological Assessment of Project IM-OOMS(371), Gwinnett County

Project IM-OOMS(371) in Gwinnett County proposes to reconstruct and rehabilitate the existing ramps and shoulders of the 1-85 and CR 134/Hamilton Mill Road interchange with concrete pavement.

Glynn 1996
6452 Rotenstein, David S. Archaeological Assessment of Project FR-78-1(14), Gwinnett County

The project is the widening and reconstruction of S.R. 124 from the intersection with C.R. 329 at the Snellville City Limits, north to the intersection of S.R. 8/U. S. 29. The proposed corridor is 130 feet wide and 6.1 miles long.

Glynn 1999
6453 Fleming, Sherry Archaeological Assessment of STP-00MS(356), Gwinnett/Walton Counties

The proposed project consists of the paving of 0.6 m (2 ft) of the existing shoulders along SR 20 in Gwinnett and Walton Counties. The project would begin approximately 161 m (528.2 ft) east of Park Place (MP 19.15) and would end at the Rockdale County line (MP 7.19).

Glynn 1999
6454 Paglione, Teresa L. Archaeological Re-evaluation of Project FR-054-1(37), Gwinnett County

The proposed project would widen and reconstruct State Route 20 beginning just southeast of Ozora Road and extending northwesterly to Plantation Boulevard. The existing right-of-way is 100 feet; the proposed right-of-way is 175 feet.

Glynn 2000