Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
7835 Mustonen, Heather Archaeological Reevaluation of GDOT Project EDS-0027-00(095), Chattooga County; PI 621082; HP-970103-001

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, GDOT Project EDS-0027-00(095), Chattooga County, has been surveyed with respect to archaeological resources, especially those an or eligible for inclusion in the National Register of Historic

Bartow 2003
7836 Blackwelder, Jon R., Pietak, Lynn Marie Phase I Archaeological Survey of Briarcliff Road at LaVista Road Intersection Improvements, DeKalb County, Georgia

The purpose of this project is to improve traffic operations at the intersection of SR 236 (LaVista Road) and SR 42 (Briarcliff Road).

Cherokee 2003
7837 Port, David, Webb, Robert S., Finney, W. Bozarth Phase I Cultural Resources Survey of the Proposed Indian Creek Reservoir Carroll County, Geogria

Between October and December 2008, R.S. Webb & Associates (RSWA) conducted a Phase I cultural resources survey of a 302-hectare (ha) [748-acre] reservoir impoundment site in Carroll County, Georgia.

Chatham 2007
7838 Sipe, Ryan O. Phase I Archaeological Survey of Proposed US 41 Passing Lanes, Dooly County, Georgia

In July 2014, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey for the proposed expansions of United States (US) 41 in order to add passing lanes in Dooly County, Georgia (GDOT P.I. No. 0011428).

Dooly 2004
7839 Sweeney, Alexander Y., Reynolds, Michael W. Phase I Cultural Resources Survey and Assessment of Effects Epic Midstream Rail Rehabilitation Spur Corridor

From April 18 through April 25, 2013, Brockington and Associates, Inc. conducted a Phase I Cultural Resources Survey of the Epic East Terminal rail spur corridor in Savannah, Chatham County, Georgia (see Figure 1.1).

Paulding 2004
7840 Wettstaed, James R. Cultural Resource Investigation for Bynum Branch Timber Sale, Chattoga River Ranger District, Chattahoochee-Oconee National Forests, Rabun County, Georgia

The Chattooga River Ranger District (RD) of the Chattahoochee-Oconee National Forests is proposing to harvest timber in Rabun County, Georgia on 85 acres in Compartment 28 using a commercial timber contract.

Fulton 2013
7841 Bloom, Jonathan A., Bowen, Neil J., Webb, Robert S. Phase I Cultural Resources Survey Big Indian Creek Mitigation Site Indian Creek Water Supply Reservoir Project Carroll County, Georgia

During the period of January 31 through February 18, 2013, R.S. Webb & Associates conducted a Phase I cultural resources survey of the proposed Big Indian Creek mitigation site as part of the Indian Creek water supply reservoir project in Carroll County, Georgia.

Laurens 2003
7842 VanBuren, Maurie Georgia Transmission Corporation Historic Resources Survey East Georgia College 115/25 kV Substation

This report contains a Project Location Map, which identifies the general location of the study area, and a Project Boundary and Map of Resources Surveyed, which identifies the project boundaries on a USGS Quadrangle map. Numbers on this second map are keyed to survey forms on each resource.

Tift 2013
7843 Gresham, Thomas H. Archeological Survey of the Proposed Thurmond Tanner Road Realignment, Hall County, Georgia

Southeastern Archeological Services, Inc., conducted an intensive cultural resources survey of the proposed realignment of a 3.3 km length of Thurmond Tanner Road in southern Hall County.

Chatham 1999
7844 Butler, C. Scott, Reynolds, Michael W. Cultural Resource Survey of the Rinker-Macon Quarry West Tract, Jones County, Georgia

From March 26 through March 28, 2007, Brockington and Associates, Inc. conducted Phase I Cultural Resources Survey of the Rinker-Macon Quarry West Tract in Jones County, Georgia (Figure 1 ).

Jasper 1996