Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
7825 McCarley, Billy J. Phase I Archaeological Survey of the Proposed Harmony Senior Living Community Project in Spalding County, Georgia

An intensive Phase I Archaeological Survey was conducted of the proposed Harmony Senior Living Community project located on the comer of SR 92/McIntosh Road and Cowan Road in Griffin, Georgia. (Fig. 1).

Cobb 2003
7826 Tankersley, Matthew, Keith, Scot J. Phase I Archaeological Survey for Intersection Improvements at S.R. 22/U.S. 80 at C.R. 33/Holley Road

The project would replace the current intersection between S.R. 22 and Holley Road with a roundabout. The proposed project includes a corridor extending 2,400 feet along S.R. 22 and 600 feet on Holley Road, both centered on the intersection. The S.R.

Clayton 2001
7827 Sweeney, Alexander Y., Reynolds, Michael W. Phase I Archaeological Resources Survey of the West Point Interchange Tracts, Troup County, Georgia

Brockington and Associates, Inc. conducted a Phase I cultural resources survey of two tracts (totaling approximately 680 acres) for the proposed West Point Interchange in Troup County, Georgia, between 5 and 16 June 2006.

McIntosh 2007
7828 Koch, Christopher P. Lake Howard Road Emergency Repair

This project consisted of the emergency repair of a portion of Lake Howard Road where it crosses over the Lafayette City Reservoir at Mile Post 0.8 that was damaged by the September 2009 flood (Figure 1). Specifically.

Camden 2006
7829 Pietak, Lynn Marie Phase I Archaeological Survey of Piedmont Road at Habersham Road Improvements, Fulton County, Georgia

The proposed project is located in the Buckhead community of Atlanta, in Fulton County. The project is located along SR 237/Piedmont Road between the Intersection of Habersham Road and the adjacent signalized intersection at the Piedmont Center office park driveway.

Bulloch 2007
7830 Pietak, Lynn Marie Addendum to Improvements to Perimeter Summit Parkway, Lake Hearn Drive, and Parkside Place

Proposed streetscape construction along Perimeter Summit Parkway (0.69 miles), Lake Hearn Drive (0.61 miles), and Parkside Place (0.27 miles) includes overall pedestrian access improvements that include the addition and/or renovation of sidewalks, Americans with Disabilities Act (ADA) compliant

Effingham 2007
7831 Pietak, Lynn Marie Phase I Archaeological Survey of SR 204/Abercorn Street Extension Improvements from Veterans Parkway (CR 975) to Rio Road (CS 1201), Chatham County, Georgia

The proposed project would improve SR 204fAbercorn Street Extension from east of Veterans Parkway (CR 975) in unincorporated Chatham County to east of Rio Road (CS 1201) in the City of Savannah.

Warren 2007
7832 Carlock, Michael D. Phase I Archaeological Survey for the Proposed Bridge Replacement over House Creek on US 129/SR 11 in Ben Hill County, Georgia

This report presents the results of Phase I archaeological survey conducted for Georgia Department of Transportation (GDOT) project PI No. 0011676, in Ben Hill County, Georgia. The proposed project would replace the substandard bridge on US 129/SR 11 over House Creek.

Tift 2013
7833 Joseph, Joseph W. Phase I Archaeological Survey of the SR 10/US 78 WBL Bridge over the Apalachee River

When New South Associates initially conducted Phase I archaeological survey of the SR 1 0/US 78 WBL Bridge project in 2008, the project was described as follows:

Fulton 2013
7834 Koch, Christopher P. Addendum to Phase I Archaeological Survey of the I-75/Jodeco Road Interchange, Henry County

The current project consisted of two minor changes to the original plans for the 1-75 and Jodeco Road interchange that was originally surveyed by Hamby (2003; 2007).

Calhoun 2012