Report Number Author(s) Title Abstract Summary County Year
7975 Roberts, Joseph Phase I Archaeological Survey of the Proposed Elliott Road Bridge Replacement at Walnut Creek, Henry County, Georgia

The proposed project would consist of replacing the structurally deficient two‑lane bridge at CR 131/EIIiott Road over Walnut Creek approximately .50 mile northeast of the City of McDonough in Henry County.

Elbert 2013
7976 Pietak, Lynn Marie Phase I Archaeological Survey of Holly Springs Parkway Pedestrian Facilities, Cherokee County, Georgia

The Holly Springs Parkway Pedestrian Facilities Phase II project consists of new curb and gutter, 5‑foot sidewalks, and pedestrian lighting within a proposed shoulder width of 11 to 16 feet along both sides of Holly Springs Parkway from ACE Academy to Pinecrest Road.

Bibb 2012
7977 Perrine, Rachel Archaeological Survey for an Operational Improvement Project at the Interstate 95 and State Route 25/US Highway 17 Interchange in Richmond Hill, Bryan County, Georgia

The proposed project is at the interchange oflnterstate 95 (I‑95) and State Route (SR) 25/US Highway (US) 17, in the city of Richmond Hill, Bryan County, Georgia.

Greene 2003
7978 Blackwelder, Jon R. Phase I Archaeological Survey for the Clarkston Streetscape and Pedestrian Enhancement Project, DeKalb County, Georgia

The proposed project would construct streetscape improvements within the City of Clarkston on East Ponce de Leon Avenue, Market Street, Rowland Street, and Norman Streets.

Gwinnett 2012
7979 Pappas, Andrew A. A Phase I Archaeological Resources Survey of the SR 92/US 41 Intersection, Cobb County, Georgia

The study area for this project consists of the intersection of State Route 3 (SR 3)/US 41/Cobb Parkway and SR 92/Dallas Acworth Highway located in Cobb County, Georgia.

Haralson 2013
7980 Joseph, Joseph W., Tankersley, Matthew, Valk, Diana, Ciomek, Summer Phase I Survey and Archaeological Testing of the Bridge Replacement at SR 216 over Ichawaynochaway Creek
Johnson 2013
7981 Williams, Siska Low Impact Bridge Program

This project is part of a larger statewide bridge project that meet the program's "low impact" requirements. These bridges are structurally deficient and will be replaced.

Grady 2001
7982 Williams, Siska Advanced Acquisition for parcels associated with SR 20 to SR 316

The project proposes to acquire one section of a parcel that was divided into three parcels in 2012 (tax parcel numbers 7018 030) for advanced hardship acquisition along the proposed improvements associated with GDOT Project PI No. 0006924.

Greene 1988
7983 Williams, Siska Reevaluation of State Road (SR) 97 @ Big Slough 3.2 miles northeast of Bainbridge

The proposed project would replace the existing 170 ft. x 26 ft. (1 x w), five‑span bridge over Big Slough along SR 97, approximately 3.2 miles northeast of Bainbridge, in Decatur County, Georgia.

Greene 1988
7984 Quirk, Phillip W., Pietak, Lynn Marie Phase I Archaeological Survey of the Proposed Safety and Operational Improvements to Nance Road, Cobb County, Georgia

During September 2010, Edwards‑Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed safety and operational improvements to Nance Road. In addition, a proposed 2.9 acre borrow area was surveyed in February 2011.

Greene 1995