Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
7995 Sebestyen, Kimberly M., Skocik, James Addendum Phase I Archaeological Survey, I-75 Widening and Reconstruction at CR 240/Old

In July of 2009, KCI Technologies conducted an additional Phase I archaeological survey in conjunction with revisions to the 1-75 widening and reconstruction project (GDOT Project NHS-0000-00(763), PI# 0000763, HP-080401 0-002).

Heard 2010
7996 Green, Lillian Phase I Archaeological Survey of SR 138 at East Fairview Road Southwest Intersection, Rockdale County, Georgia

The proposed project is located in Rockdale County at the intersection of SR 138/Stockbridge Highway and E. Fairview Road SW The existing SR 138/Stockbridge Highway consists of two 12-foot travel lanes (one in each direction) and paved shoulders.

Troup 2010
7997 Pietak, Lynn Marie, Blackwelder, Jon R. Phase I Archaeological Survey of SR 9 from Upper Hembree Road to Windward Way, Fulton County, Georgia

This project is within the City of Alpharetta, Fulton County, and consists of the widening and reconstruction of SR 9, reconfiguration of sideroads, pedestrian improvements and signal upgrades. The work is divided into two projects, PI 721790 and 721780.

Gordon 1996
7998 Williams, Siska, Baughman, Pamela J., Pomfret, James SR 144 at I-95 Southbound and Northbound Off Ramps

This project proposes improvements to SR 144 at the I-95 Interchange and to the I-95 northbound and southbound off ramps.

Gordon 1996
7999 Williams, Siska Reevaluation of Operational Improvement on S141 SB/Peachtree Parkway SB at Peachtree Industrial Boulevard SB

The original project description reads: The proposed project involves the addition of a second lane from SR141 southbound onto the limited access portion of Peachtree Industrial Boulevard southbound by constructing a new lane on the left shoulder of the existing lane from SR141 SB onto Peachtree

Gordon 1996
8000 Carlock, Michael D. Ramp Improvements on SR 400 Southbound at SR 140/Holcomb Bridge Road, Fulton County, Georgia

The proposed project limits extend along the southbound SR 400 entrance ramp where SR 400 transitions from four lanes to three lanes and continues northward until reaching approximately 1000 feet beyond the SR 400 southbound exit ramp (Figures 1 and 2).

Towns 2012
8001 McKay, Melissa, Carlock, Michael D. SR 362 at CR 507/Rover Zetella Road/Moreland Road

Original Project Description: The intersection of State Route (SR) 362 at County Road (CR) 507 is located approximately 3.0 miles southwest of the interchange of SR 3/US 19/41 and 1.54 miles northeast of the Pike County Line on SR 362 in Spalding County.

Grady 1997
8002 Blackwelder, Jon R. Phase I Archaeological Survey for the Proposed SR 155 Safety Improvement Project, Henry County, Georgia

The proposed project consists of three improvements. The first improvement is an intersection at SR 155 at Hampton-Locust Grove Road/Bill Gardner Parkway.

Hall 2014
8003 Perrine, Rachel, Williams, Siska, Carlock, Michael D. SR 92 at SR 14 Alternate South Fulton Parkway

The intersection of SR 92/Campbellton Fairburn Road and SR 14/South Fulton Parkway is located in Southwest Fulton County.

Grady 1999
8004 Moore, Nick, Beazley, Matthew TCNS ID 122987 Proposed 140-Foot Monopole Telecommunications Structure (145-Foot Overall Height Including Appurtenances)

Environmental Corporation of America (ECA) has completed an Archaeological Assessment for the federal undertaking at the subject site.

Grady 2001