8025 Sudnik, Rachel, Beazley, Matthew TCNS ID 122574 Proposed 160-Foot Monopole Telecommunications Structure (165-Foot Overall Height with Appurtenances)

Environmental Corporation of America (ECA) has completed an Archaeological Assessment for the federal undertaking at the project area.

Gordon 1984
8026 Johnson, Eric, Bazzill, Dina M. TCNS ID 100267 Proposed 150-Foot Monopole Communications Structure (163-Foot Overall Height Including Appurtenances)

Environmental Corporation of America’s (ECA) client, Georgia Power Company, is proposing to construct a communications facility as described in the following FCC Form 620, New Tower (NT) Submission Packet.

Pickens 1998
8027 Silliman, Garrett W., Hise, Alana Phase I Archaeological Survey of Proposed Safety Improvements to SR 42/US 23 in Henry County, Georgia

The proposed project is located at the intersections of SR 42/US 23 with CR 648/Locust Grove Griffin Road and with CR 328/Roberts Road/Grove Road in Locust Grove, Henry County, Georgia.

Pickens 0
8028 Williams, Siska Low Impact Bridge Program

This project is part of a larger statewide bridge project that meet the program's "low impact'' requirements. These bridges are structurally deficient and will be replaced.

Peach 1984
8029 VanBuren, Maurie Mill Pond Road 115 kV Transmission Line

The week of July 4, 2011, Brockington and Associates completed a background literature review and field investigations for a Phase I cultural resources survey for the proposed approximately 8 acre Mill Pond Road Substation site in Newton County, Georgia (Figure 1).

Glynn 2002
8030 Falvey, Lauren W. Phase I Archaeological Survey of the Proposed Resurfacing along State Route 26/US 80/Northside Drive East, Bulloch County, Georgia

The proposed work consists of milling, resurfacing, leveling, patching, and curb cuts along a 2.5 mile section of State Route (SR) 26/US SO/Northside Drive East in Bulloch County.

Glynn 2005
8031 Silliman, Garrett W. Second Addendum to the Phase I Archaeological Survey of the SR 138 Extension, Walton County, Georgia

Original: GDOT proposes to extend SR 138 on new location from U.S. 78/SR 10 Bypass to SR 11. The proposed typical section would consist of two 12-foot travel lanes separated by a 14-foot center turn lane on approximately 150 feet of right-of-way.

Glynn 1994
8032 Williams, Siska Low Impact Bridge Program

This project is part of a larger statewide bridge project that meet the program’s “low impact” requirements. These bridges are structurally deficient and will be replaced.

Gwinnett 2014
8033 Lotti, Teresa Ann Archaeological Assessment of Emergency Slope Repair on SR 62 at Milepost 0.0 (Alabama State Line) in Early County

"In compliance with Section 106 ()f the National Historic Preservation Act of 1966 and amendments thereto, the emergency slope repair on SR 62 in Early· County, has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Hi

Douglas 1993
8034 Williams, Siska Low Impact Bridge Program

This project is part of a larger statewide bridge project that meet the program's "low impact" requirements. These bridges are structurally deficient and will be replaced.

Chatham 2014