Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
8055 Silliman, Garrett W., Hise, Alana Addendum to the Phase I Archaeological Survey of SR 136 over West Chickamauga Creek

Original: The project is located on SR 136 at the crossing of West Chickamauga Creek in Walker County, Georgia. The proposed project would replace the existing two-lane bridge with a slightly longer concrete bridge structure that is approximately 40-foot wide.

Jasper 2014
8056 McCarley, Billy J. Phase I Archaeological Survey of I-85 at SR 324 Interchange

The proposed project consists of the construction of a diamond interchange at Interstate 85 (1-85) and State Route 324 (SR 324).

Barrow 2013
8057 Williams, Siska Low Impact Bridge Program

This project is part of a larger statewide bridge project that meet the program's "low impact'' requirements. These bridges are structurally deficient and will be replaced.

Miller 2014
8058 Williams, Siska Low Impact Bridge Program

This project is part of a larger statewide bridge project that meet the program's "low impact" requirements. These bridges are structurally deficient and will be replaced.

Lee 2014
8059 LaForge, Travis B., Beazley, Matthew TCNS ID 125982 Proposed 300-Foot Tall Self-Supporting Telecommunications Structure (305-Foot Overall Height Including Appurtenances)

Environmental Corporation of America (ECA) has completed an Archaeological Assessment for the federal undertaking at the subject site.

Dawson 2014
8060 Falvey, Lauren W. Third Addendum to Phase I Archaeological Survey for Proposed Pedestrian Improvements in District 6

The proposed project would consist of upgrading pedestrian facilities at various locations throughout District 6.

Chatham 2014
8061 Avila, Iris, Bazzill, Dina M. TCNS ID 125451 Proposed 190-Foot Monopole Telecommunications Structure (199-Foot Overall Height Including Appurtenances)

Environmental Corporation of America (ECA) has completed an Archaeological Assessment for the federal undertaking at the subject site.

Dougherty 2014
8062 Jackson, Paul D. Archaeological Mitigation of Site 9CE2470 for Fort Benning Military Reservation, Chattahoochee County, Georgia

In 2008, the Department of the Army at Fort Benning Military Reservation requested a technical proposal for the archaeological mitigation (Phase III) of Site 9CE24 70 in Chattahoochee County, Georgia.

Putnam 1995
8063 Owens, Daphne L. Archaeological Survey for the Dallas Battlefield Trail, Phase II, Paulding County, Georgia

The project will be completely within the boundaries of the City of Dallas. The project will complete a 10 ft paved trail (8ft in some locations) from the Chattahoochee Tech Spur of Silver Comet Trail to the City's Sara Babb Park.

DeKalb 2014
8064 Blackwelder, Jon R. Phase I Archaeological Survey of the Proposed Roundabout at the Intersection of SR 52 and SR 115/Copper Mines Road, Lumpkin County, Georgia

The proposed project is located in Lumpkin County at the intersection of State Route (SR) 52 and SR 115/Copper Mines Road. The project consists of intersection reconstruction into a single-lane roundabout. The purpose of the project is to improve operational efficiency and safety.

Fulton 2014