Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
8095 Perrine, Rachel Archaeological Survey for Proposed Roadway Improvements and Curb Cuts along State Route 125 in Nashville, Berrien County, Georgia

The proposed work consists of milling, resurfacing, patching, leveling, striping, earth shoulder filling, and curb cuts along a 0.68-mile section of State Route (SR) 125 in Berrien County from 34 feet north of the SR 11 and SR 76 intersection to 454 feet north of the Nashville/Enigma Highway (Fig

Twiggs 2012
8096 McCarley, Billy J. Negative Findings Phase I Archaeological Survey of the Proposed Oconee Springs Telecommunications Lease and Access in Eatonton, Putnam County, Georgia

Subterraine performed an intensive Phase I archaeological survey on March 20, 2015 of the proposed lease area and access of the Oconee Springs telecommunication project located in Eatonton, Georgia (33º 20’ 41.2” N, 83º 12’ 41.5” W).

Fayette 2014
8097 Carlock, Michael D. SR 30/SR 90 Widening to Four Lanes from East of I-75 to Midway Road in Cordele, Georgia

SR 30/SR 90/US 280 just east of 1-75 consists of a rural section with two 12 foot through lanes (one lane eastbound and one lane westbound) and a 14 foot continuous center turn lane with 10 foot rural shoulders.

Chatham 2012
8098 Beazley, Matthew, Bazzill, Dina M. Archaeological Assessment TCNS ID #126129 Proposed 199-Foot Monopole Telecommunications Structure Within an Appropriate 5,270 Square-Foot (490 Square Meter) Lease Area Bonanza 609 Highway 96 Warner Robins, Houston County, Georgia

Environmental Corporation of America (ECA) has completed an Archaeological Assessment for the federal undertaking at the subject site.

Stephens 2014
8099 Williams, Siska State Route (SR) 400 at Interstate 285 (I-285) Interchange Reconstruction

The proposed project would include operational improvements along I-285 and SR 400 in the vicinity of the I-285/SR 400 interchange.

Glynn 2011
8100 Futch, Jana J, Butler, C. Scott Archaeological Data Recovery Investigations at 9GE2085: An Early-Nineteenth-Century Farmstead at Reynolds Plantation

In January, 2014, Brockington and Associates completed a Phase III Data Recovery on 9GE2085, a multicomponent prehistoric and historic site with two rock piles in Greene County, Georgia.

Hall 2012
8101 McCarley, Billy J. Phase I Archaeological Survey of the Proposed Tomacheechee Telecommunications Facility in Rincon, Effingham County, Georgia

A Phase I archaeological survey was performed on May 2, 2015 of the proposed lease area, access, and utility easement (hereafter called survey area) of the Tomacheehee telecommunication facility located in Rincon, Georgia (32º 17’ 24.54” N, 81º 13’ 19.58” W).

Chattooga 2012
8102 Keith, Scot J., Raymer, Leslie E., Davis, Valerie, Severts, Patrick, Seramur, Keith C. Phase III Archaeological Data Recovery Mitigation of 9GO297

The Georgia Department of Transportation (GDOT) plans to realign State Road (SR) 225 in conjunction with the replacement of structurally deficient bridges located on SR 225 over New Town Creek and the Coosawattee River in Gordon County, Georgia.

Walker 2012
8103 Perrine, Rachel Addendum to Phase I Archaeological Survey for Proposed Bridge Replacement along State Route 230 over Turkey Creek, Dooly County, Georgia

The proposed project would consist of the replacement of the structurally deficient bridge on State Route (SR) 230 over Turkey Creek 9.5 miles west of Vienna in Dooly County, Georgia (Figure 1).

Cobb 2012
8104 Carlock, Michael D. Maintenance and Minor Repair Including Curb Cuts on SR 21 from 0.20 Miles North of NS#916917C to Jacks Branch in Effingham County

The proposed project consists of maintenance and minor repair on SR 21 from Rincon to Springfield, Georgia. The project includes milling, resurfacing, patching, striping, and curb cuts. There are 12 curb cut (wheelchair) ramps to be constructed.

Putnam 2011