Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
8105 McCarley, Billy J. Phase I Archaeological Survey of the Proposed Twin Bridges Telecommunications Lease and Access in Eatonton, Putnam County,

Subterraine performed an intensive Phase I archaeological survey on March 20, 2015 of the proposed lease area and access of the Twin Bridges telecommunication project located in Eatonton, Georgia (33º 11’ 11” N, 83º 22’ 51.8” W).

Greene 2013
8106 Carlock, Michael D. Traffic Signal Installation at the Intersection of SR 105/US 441 and SR 15/US 23 Southbound Ramps

The proposed project involves the installation of a traffic signal at the intersection of SR 105/US 441 and US 23/SR 15 southbound ramps (Figures 1 and 2}.

Chatham 2012
8107 Wood, W. Dean A Cultural Resources Survey of the Proposed Town Creek Timber Sale Greene County, Georgia

Southern Research, Historic Preservation Consultants, Inc. has completed a cultural resources survey of the Town Creek Timber Sale Project in the Oconee National Forest Oconee Ranger District. This project consists of a cultural resources survey of 826 acres of land in Greene County, Georgia.

Chatham 2013
8108 Blackwelder, Jon R. State Route 166/Duncan Memorial Highway and State Route 92/State Route 154 Intersection Improvements, Douglas County

Implementation of the proposed project would result in a finding of No Adverse Effect for archaeological site 9DO2. No right-of-way or easements would be required from within the site’s National Register eligible boundary as all construction work would occur outside this limit.

Monroe 2013
8109 Johnson, Eric, Bazzill, Dina M. TCNS ID 121191 Proposed 180-Foot Monopole Communications Structure (193-Foot Overall Height Including Appurtenances)

Environmental Corporation of America (ECA) has completed an Archaeological Assessment for the federal undertaking at the subject site.

Pierce 2014
8110 Baughman, Pamela J. SR 26 from West of CR 1111/Coleman Blvd. to East of CSX Railroad

This project includes an approximately 7 mile section of SR 26 in Chatham County, beginning at the pavement joint that is 1,990 feet (ft.) west of Coleman Blvd. and ending at the pavement joint 800 ft. east of the railroad tracks (MP 5.954 to MP 12.956).

Putnam 2013
8111 Carlock, Michael D. Maintenance and Minor Repair Including Curb Cuts on SR 71 from North of CR 567/Roland Hills Drive to North of CS 274/Wolfe Street in Whitfield County, Georgia

The proposed project consists of maintenance and minor repair on SR 71 from Waring to Cohutta, Georgia. The project includes milling, resurfacing, loop detectors, rumble strips, raised pavement markers, striping, removal/disposal of asphalt, and curb cuts.

Clinch 2014
8112 Williams, Siska Bridge Foundation Investigation for the SR 347 Bridge over Norfolk Southern #717815K

The proposed safety project would consist of a bridge foundation inspection of GDOT Bridge ID#139-5085-0 located at SR 347/Friendship Road over Norfolk Southern #717815K. The process would consist of drilling 4-inch holes through the bridge deck and into the ground.

Brantley 2013
8113 Carlock, Michael D. Maintenance and Minor Repair Including Curb Cuts on SR 14 from SR 18 to North of CS 1187/Medical Parkway in Troup County, Georgia

The proposed project consists of maintenance and minor repair on SR 14 from West Point to LaGrange, Georgia. The project includes milling, resurfacing, striping, leveling, patching, and curb cuts. There are 7 curb cut (wheelchair) ramps to be constructed.

Forsyth 2014
8114 Williams, Siska Sr 404 Spur at CR 744/Hutchinson Island Road Ramp Interchange

The proposed project will repair a section of failed roadway and washed out grass shoulder.

Cherokee 2013