Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
8145 Gantt, Mary Elizabeth Phase I Cultural Resources Survey of the Racetrac Camp Creek Parkway Site, Fulton County, Georgia

Background

Fulton 2013
8146 Pietak, Lynn Marie 2012 Addendum to Phase I Archaeological Survey of Carpenter Road, Tift County, Georgia

The proposed project calls for the reconstruction, rehabilitation, and widening of Carpenter Road (CR 75) in Tift County. The project begins at SR 520/US 82 and extends north to Davis Road (CR 216) and is partially within the city limits of the City of Tifton.

Houston 2012
8147 Johnson, Robert E. Archeological Excavations of 9CM167 and 9CM173 at King's Bay, Camden County, Georgia

During the winter quarter of 1978, (January-March) the Department of Anthropology conducted test excavations of two archeological sites on the U.S. Military Ocean Terminal, King's Bay (MOTKI), located in southeastern Camden County, Georgia.

Chatham 2013
8148 Sweeney, Alexander Y. Phase I Archaeological Survey for the Addendum to the SR119/Airport Road Widening, Liberty County, Georgia

Main project: The original proposed project consisted of widening SR 119/Airport Road from the existing two lane facility to a four lane divided highway with a 24 foot raised median on a proposed right-of-way that varies from 160 to 200 feet.

Stephens 2012
8149 Baughman, Pamela J. CR 183/Mosely Road at Mule Creek

There are no previously recorded archaeological sites which have been identified within 1 kilometer of the project area. There are no known previous archaeological surveys of the project area.

Gwinnett 2012
8150 Thomas, Larissa A., Tucker, Emily Kate, Holland, Jeffrey L. Cultural Resource Survey for the Proposed Six-Acre Wastewater Treatment Plant Site in Flovilla, Butts County, Georgia

TRC was contracted by the City of Flovilla to carry out a Phase I cultural resource survey of a 6-acre tract slated for a wastewater treatment facility in Butts County, Georgia.

Jones 2012
8151 Owens, Daphne L. Archaeological Survey of the Main St, First Ave and Railroad Ave Pedestrian Improvements

The project would include the replacement of existing uneven and inadequate sidewalks, as well as the provision of ramps and streetscape improvments along the south side of Main St, beginning at Church St and ending at First Ave.

Gwinnett 2009
8152 Baughman, Pamela J. Bridge Replacement on SR 118 at Muckaloochee Creek

This project consists of the replacement of the bridge on SR 118 at Muckaloochee Creek. The bridge would be replaced in its existing location, while utilizing an off-site detour. The approximate project length is 400ft. Existing right-of-way is 80ft.

Chatham 2013
8153 Blackwelder, Jon R. Phase I Archaeological Survey of the On-Ramp Reconstruction from Abernathy Road to SR 400, Fulton County, Georgia

The proposed project would consist of the reconstruction of the on-ramp from Abernathy Road to SR 400 northbound to add approximately one-quarter mile of pavement.

Cobb 2013
8154 Owens, Daphne L. Archaeological Phase I Survey for the Dogwood Pedestrian Improvements from South Central Avenue to North Avenue, Hapeville, Fulton County, Georgia

The proposed streetscape and sidewalk improvement extend along Dogwood Drive approximately 2,300 linear feet from its intersection with South Central Avenue Oust south of MP 1.44) to North Avenue (MP 1.81), perpendicular to the City's main business corridor.

Jackson 2011