Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
8015 Williams, Siska Low Impact Bridge Program

This project is part of a larger statewide bridge project that meet the program's "low impact" requirements. These bridges are structurally deficient and will be replaced.

Grady 2002
8016 Avila, Iris, Bazzill, Dina M. TCNS ID 122197 Proposed 250-Foot Monopole Telecommunications Structure (255-Foot Overall Height Including Appurtenances)

Environmental Corporation of America (ECA) has completed an Archaeological Assessment for the federal undertaking at the subject site.

Harris 1991
8017 Moore, Nick, Beazley, Matthew TCNS ID 122432 Proposed 170-Foot Monopole Telecommunications Structure (175-Foot Overall Height Including Appurtenances)

Environmental Corporation of America (ECA) has completed an Archaeological Assessment for the federal undertaking at the subject site.

Greene 1972
8018 Carlock, Michael D. Proposed Bridge Replacement over Grove Creek on SR 59 in Banks County, Georgia

The proposed project would take place on SR 59 in Banks County, five miles north of Commerce, Georgia {Figures 1 and 2}. The existing typical section of SR 59 consists of two 12-foot travel lanes with no shoulders, one in each direction.

Hancock 1972
8019 Avila, Iris, Bazzill, Dina M. TCNS ID 122317 Proposed 180-Foot Monopole Telecommunications Structure (185-Foot Overall Height Including Appurtenances)

Environmental Corporation of America (ECA) has completed an Archaeological Assessment for the federal undertaking at the subject site.

Morgan 1972
8020 Gregory, Danny, Walls, Lauren Phase I Archaeological Survey of 120 Acres in Training Areas 1 and 23

New South Associates conducted a Phase I Archaeological Survey of approximately 120 acres in Training Areas 1 (74 ac.) and 23 (46 ac.) at Fort Gordon, Augusta, Georgia.

Richmond 2015
8021 Burnham, Grant, Bazzill, Dina M. TCNS ID 101986 Proposed 150-Foot Monopole Communications Structure (163-Foot Overall Height Including Appurtenances)

Environmental Corporation of America's (ECA) client, Georgia Power Company, is proposing to construct a communications facility as described in the following FCC Form 620, New Tower (NT) Submission Packet.

Glynn 2014
8022 McKay, Melissa Subsurface Archaeological Survey of the Head Family Plantation in the Oconee National Forest, Putnam County, Georgia

This report presents the results of an archaeological survey conducted in the Oconee National Forest in Putnam County, Georgia. During the first half of 2011, 150 acres were surveyed on U.S. Forest Service land known as the Head Plantation during the 19th century.

Douglas 2014
8023 Williams, Siska Low Impact Bridge Program

This project is part of a larger statewide bridge project that meet the program's "low impact" requirements. These bridges are structurally deficient and will be replaced.

Fulton 2014
8024 Williams, Siska Low Impact Bridge Program

This project is part of a larger statewide bridge project that meet the program's "low impact" requirements. These bridges are structurally deficient and will be replaced ..

Bryan 2012