8584
|
Fleming, Sherry, Bowen, Rowe
|
Archaeological Assessment o f BRSLB-1212(4), Brooks County
|
The following is being furnished to you for inclusion as written, in the appropriate environmental document:
|
Paulding
|
2015
|
8591
|
Entorf, Robert F., Fleming, Sherry
|
Archaeological Assessment of Project STP-011-1(50), Muscogee County
|
The proposed project would consist of the paving of approximately 0.6 m (2 ft left and right) of the existing shoulders on SR 1/US 27 in Muscogee County. The project would begin at the intersection of I-185 and end at the intersection of Moon Road.
|
Fulton
|
2015
|
8594
|
Entorf, Robert F., Fleming, Sherry
|
Archaeological Assessment of Project SAPS-27(169), Sumter County
|
Project SAPS-27(169) involves signalization improvements for twenty locations in the city of Americus. Improvements include upgrading of traffic signal heads, upgrading of poles and mast arms, installation of traffic loop detectors, and various other equipment upgrades.
|
Walker
|
2009
|
8601
|
Entorf, Robert F., Fleming, Sherry
|
Archaeological Assessment of Project STP-073-2(10), Pierce County
|
The proposed project would consist of the leveling and resurfacing of SR 15/ S 84 in Pierce County. The proposed project would begin at the intersection of SR 38 in the city of Blackshear and would end at the bridge over Big Satilla Creek at the Appling County line.
|
Brooks
|
2015
|
8609
|
Fleming, Sherry, Entorf, Robert F.
|
Archaeological Assessment of Project STP-0966(7), Pierce County
|
The proposed project would consist of the paving of 0.6 m (2 ft) shoulders of SR 185 in Pierce County. The proposed project would begin approximately 0.193 km (0.12 mi) south of CR 83 (MP 6.50) and end at the Bacon County line (MP 12.10).
|
Atkinson
|
2015
|
8613
|
Entorf, Robert F., Fleming, Sherry
|
Archaeological Assessment of Project STP-0655 (4), Stewart County
|
The proposed project would consist of the construction and paving of a 0.60 m (2.0 ft) paved shoulder on SR 39C in Stewart County. The project would begin at the intersection of SR 39 (MP 0.00) and would end at the intersection of SR 1 (MP 15.88).
|
Bryan
|
2014
|
8614
|
Entorf, Robert F., Fleming, Sherry
|
Archaeological Assessment of Project STP-2107(2), Elbert County
|
The proposed project would consist of the paving and widening to 0.6 m (2 ft) of the existing shoulders on SR 77 Connector in Elbert County. The project would begin at the intersection of SR 77 (MP 0.00) and would end at the intersection of SR 17 (MP 1.35).
|
Troup
|
2015
|
8618
|
Entorf, Robert F., Fleming, Sherry
|
Archaeological Assessment of STP-029-1(42), Sumter County
|
The proposed project consists of the leveling and resurfacing of SR 49 in Sumter County. The project would begin at the Terrell County line (MP 0 . 00) . The project would end at approximately MP 13.44.
|
Berrien
|
2015
|
8619
|
Entorf, Robert F., Fleming, Sherry
|
Archaeological Assessment of Project STP-0641(8), Stewart County
|
The proposed project would consist of the leveling and resurfacing of SR 39 Spur and SR 39. The project would begin at the Alabama State line and would end at SR 1.
|
Putnam
|
2015
|
8621
|
Fleming, Sherry, Entorf, Robert F.
|
Archaeological Assessment of Project STP-1004(4), Gilmer County
|
The proposed project would consist of the paving of 0.6 m (2 ft) shoulders of SR 382 in Gilmer County. The proposed project would begin at the intersection of SR 136 (MP 0.00) and would end at the intersection of Old SR 5/CR 239 (MP 10.07).
|
Houston
|
2015
|