Back to top

Falvey, Lauren W.

Report Number Author(s) Title Abstract Summary County Year
8060 Falvey, Lauren W. Third Addendum to Phase I Archaeological Survey for Proposed Pedestrian Improvements in District 6

The proposed project would consist of upgrading pedestrian facilities at various locations throughout District 6.

Chatham 2014
8066 Falvey, Lauren W. Phase I Archaeological Survey for Proposed Installation of High Mast Lighting along I-75, Bibb County, Georgia

The project proposes to install high mast lighting along 1-75 from Mile Post (MP) 166.11 Gust south of the Pierce Ave interchange) north 3.5 miles to MP 169.77 Gust south of the Arkwright Rd interchange) (Figure 1).

Putnam 1999
8070 Falvey, Lauren W. Phase I Archaeological Survey of the Proposed Improvements to the Intersection of Northridge Road and Colquitt Road in Fulton County, Georgia

The proposed work consists of improving the intersection of Northridge Road and Colquitt Road in Atlanta, Fulton County. The project proposes to install new signals, including mast poles, highway sign, pavement markings, and striping.

Lowndes 2014
8086 Falvey, Lauren W. Phase I Archaeological Survey of Proposed Resurfacing along State Route 24/North

The proposed work consists of resurfacing, patching, leveling, milling, striping, loop detectors, raised pavement markers, and curb cuts along a 1.19 mile section of State Route (SR) 24/N. Columbia Street in Baldwin County from SR 22/Montgomery Street to 80 ft north of Lakeside Drive (Figure 1).

Douglas 2014
8089 Falvey, Lauren W. Phase I Archaeological Survey of the Proposed Resurfacing along State Route 29, Laurens County, Georgia

The proposed work consists of milling, resurfacing, leveling, patching, loop detectors, striping, raised pavement markers, and curb cuts along a 5.37 mile section of State Route (SR) 29 from 400 feet before Gaines Street to county Road 471/Ed Swinson Road in Laurens County (Figure 1).

Muscogee 2014
8224 Falvey, Lauren W. Phase I Archaeological Survey for Proposed Bridge Replacement on State Route 219 over Mountain Oak Creek, Harris County, Georgia

The proposed project consists of replacing the existing bridge over Mountain Oak Creek on State Route (SR) 219 between Hopewell Church Road and SR 116, south of Whitesville (Figure 1 ).

Barrow 2011
8998 Falvey, Lauren W. Phase I Archaeological Survey of Proposed Resurfacing along State Route 45 in Early and Calhoun Counties, Georgia

The proposed work consists of resurfacing, patching, milling, 2 foot shoulder widening, curb cuts, striping, and raised pavement markers with 4 foot earth shoulder filling along a 12.16 mile section of State Route (SR) 45 from SR 62 in Early County to SR 37 in Calhoun County (Figure 1).

Gordon 1991
9035 Falvey, Lauren W. Phase I Archaeological Survey of Proposed Resurfacing along State Route 158 in Coffee County, Georgia

The proposed work consists of resurfacing, patching, milling, striping, raised pavement markers, and curb cuts along a 1.27 mile section of State Route (SR) 158 in Coffee County from SR 206 to SR 31 (Figure 1).

Thomas 1996
9038 Falvey, Lauren W. Phase I Archaeological Survey of Proposed Resurfacing along State Route 11 in Jasper County; Georgia

The proposed work consists of resurfacing, patching, milling, striping, raised pavement markers, and curb cuts along a 14.30 mile section of State Route (SR) 11 in Jasper County from SR 16/SR 83 to the Newton County line (Figure 1).

Pierce 2002
9506 Falvey, Lauren W. Phase I Archaeological Survey of Proposed Intersection Improvements, Sr 38 / US 84 / Oglethorpe Highway at CR 73 / Old Sunbury road and CR 75 / Old Hines Road in Flemington, Liberty County, Georgia

The proposed project would take place on State Route (SR) 38/ US 84/ Oglethorpe Highway in Flemington, GA approximately 2 miles east of Hinesville.

Liberty 2016
Displaying 11 - 20 of 47