5791 Hally, David J. An Archaeological Survey of The University of Georgia's Proposed Bicycle Trail: Athens-Clarke County, Georgia

The Office of Campus Planning at the University of Georgia has proposed to build a bicycle trail from Riverbend Research Center to River Road. This trail will run along the floodplain of the west bank of the North Oconee River.

Fulton 2003
5864 Hally, David J., Larson, Lewis H. Brooklyn Creek Project, Clarke County: Project Correspondence before Clearinghouse Level

None Present.

Clayton 1985
5865 Hally, David J. Preliminary Archaeological Report for Proposed Sewage System Improvements, Contract Number 10-32-RR104-039, Clarke County

This letter represents the preliminary archaeological report for the proposed sewage system improvements for the City of Athens, Contract Number 10-32-RR104-039. To date approximately 60 percent of the area has been surveyed.

Fulton 1985
5994 Hally, David J., Meyers, Maureen S. Archaeological Phase 1 Survey of One Acre Land Tract, Institute of Marine Science Field Building, Mistletoe State Park, Columbia County, Georgia

The Director of the Marine Science Institute, Dr. Ed Chin, contracted the Anthropology Department of the University of Georgia to conduct a Phase I survey of a one acre tract of land (Map 1).

Douglas 2010
6041 Hally, David J. Survey of the Area to be Effected by Georgia Department of Transportation Project, F-002-6(3), Hall County, Gainesville, Georgia

The area to be effected by the project is a corridor along Green Street and Sycamore Street for a total length of 3,500 feet. Much of the area had been cleared and graded (2250' approx) by the time of the survey. This area was surveyed on foot.

DeKalb 2010
6159 Bartovics, Albert F., Hally, David J. A Preliminary Site Report for Archaeological Salvage Undertaken at 9MG99 (The Park's Mill Site)

None present.

Coffee 2007
6160 Hally, David J., Fish, Paul R. A Preliminary Site Report for Archaeological Salvage Undertaken at 9MG28

None present.

Coffee 2002
6161 Hally, David J., Fish, Paul R. A Preliminary Site Report for Archaeological Salvage Undertaken at 9MG73

None present.

Whitfield 2001
6231 Hally, David J. Impact Statement, Highway Improvement, Claxton, Georgia, Project F-068-1(3)

The widening of US 301 through Claxton may affect two brick structures located just south of the S.C.L. tracks. The building on the east side of the highway is a two story brick business building erected in 1921.

Hall 1974
6593 Hally, David J. Survey of the area to be effected by Georgia Department of Transportation Project, BR-S-2216(3)

The area to be effected by the proposed bridge construction was surveyed on foot. The survey revealed that there are four large stone piers 10 ft. long, 12 ft. high, at the southwest end of the bridge.

Newton 1998