Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
10341 Bowen, William R. Archaeological Assessment of Project BRZLB-163(2), Jefferson County

"In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project BR ZLB-163(2), Jefferson, has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NRHP).

Jefferson 1983
10342 Banguilan, Sarah Cole Phase I Archaeological Resources Survey for the Proposed Bridge Replacements at Interstate Highway 85 over Indian Creek, Franklin County, Georgia

The proposed project would replace both the northbound and southbound bridges carrying Interstate 85 (1-85) over Indian Creek in Franklin County, Georgia. The existing steel stringer bridges were constructed in 1963.

Franklin 2018
10343 Erickson, Luke W. Archaeological Assessment of a Fulton County Bridge Rehabilitation Project

CSSTP-M003-00(132), P.I. M003132 Fulton County Bridge Rehabilitation Project

Fulton 2005
10344 Lotti, Teresa Ann, Duff, Eric Anthony Archaeological Assessment of Project NHS-0001-00(566), Lowndes County

"In compliance with Section I 06 of the National Historic Preservation Act of 1966 and amendments thereto, project NHS-0001-00(566), Lowndes County, has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Place

Lowndes 2001
10345 Pappas, Andrew A. Phase I Archaeological Survey of the Proposed SR 57 Bridge Replacement, Wilkinson County, Georgia

The proposed project would replace the existing bridge on State Route 57 (SR 57) over the Kaolin Pipe Line, approximately 1.8 miles south of Gordon, in Wilkinson County, Georgia (Figures 1 and 2). It would connect to an existing roundabout in the eastern part of the project.

Wilkinson 2018
10346 Erickson, Luke W. Archaeological Assessment of a Fulton County Resurfacing Project

This project consists of the milling, leveling, and resurfacing of SR 9, beginning at CS 9049/Church Street and ending at the Forsyth County line. All work will take place within the existing right-of way, no new right-of-way is required. Total project length is approximately 4.878 miles.

Fulton 2005
10347 McCarley, Billy J. Addendum Phase I Archaeological Survey of I-85 at SR 324 Interchange, Gwinnett County, Georgia

The proposed project consists of the construction of a diamond interchange at Interstate 85 (I-85) and State Route 324 (SR 324).

Gwinnett 2018
10348 Falvey, Lauren W. Phase I Archaeological Survey of Proposed Resurfacing along State Route 25 in Chatham County, Georgia

The proposed work consists of resurfacing, patching, milling, striping, raised pavement markers, four foot earth shoulder filling, and curb cuts for wheelchair ramps along an 1.951 mile section of State Route (SR) 25 from SR 21 to SR 307 in Chatham County, Georgia.

Chatham 2018
10349 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of Project OSAP-97-4(2), Terrell County

"In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, and the Georgia Environmental Policy Act of 1991, project OSAP- 97- 4(2) , Terrell County has been surveyed with respect to archaeological resources , especially those on or eligible for incl

Terrell 1997
10349 Erickson, Luke W. Archaeological Survey of Project CSSTP-M003-00(441), Walton County

In compliance with Section I 06 of the National Historic Preservation Act of 1966 and amendments thereto, project CSSTP-M003-00(441), Walton County, Georgia, has been surveyed with respect to archeological resources, especially those on or eligible for inclusion in the National Register of Histor

Walton 2006