Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
11742 Erickson, Luke W. Archeological Assessment of a Muscogee County Resurfacing Project

Archeological Assessment of a Muscogee County Resurfacing Project. This project consists of milling, leveling, resurfacing, and shoulder building on SR 85 beginning at M.P. 0.07 and ending at M.P. 3.42. All work will take place within the existing right-of-way. No new right-of-way is required.

Muscogee County, GA 2005
11743 Erickson, Luke W. Archeological Assessment of a Carroll/Haralson County Resurfacing Project (CSSTP-M003-00(195))

Archeological Assessment of a Carroll/Haralson County Resurfacing Project. This proposed project consists of resurfacing, milling, and grading on SR 113 beginning at SR 274 in Carroll County and ending at SR 120 in Haralson County.

Carroll County, GA 2005
11744 Hahs, David G. Phase I Archaeological Survey for SR 85 Over Whitewater Creek, Bridge 113-0009-0, Fayette County, Georgia

The project proposes to replace the bridge on State Route (SR) 85 over Whitewater Creek in Fayette County, located 3.9 miles northwest of Brooks, Georgia.

Fayette County, GA 2018
11745 Erickson, Luke W. Archeological Assessment of a Fulton County Resurfacing Project (CSSTP-M003-00(199))

Archeological Assessment of a Fulton County Resurfacing Project. This project consists of the resurfacing and maintenance of SR 140 from SR 9/Alpharetta Highway to the Gwinnett County Line. All work will take place within the existing right-of-way. An additional right-of-way is required.

Fulton County, GA 2005
11746 Erickson, Luke W. Archeological Assessment of a Calhoun County Resurfacing Project (CSSTP-M003-00(204))

Archeological Assessment of a Calhoun County Resurfacing Project. This proposed project would improve SR 62 beginning at the intersection of SR 45 (M.P. 0.32) and ending at the Calhoun/Dougherty County Line (M.P. 18.08).

Calhoun County, GA 2005
11747 Erickson, Luke W. Archeological Assessment of a Seminole/Decatur County Resurfacing Project (CSSTP-M003-00(206))

Archeological Assessment of a Seminole/Decatur County Resurfacing Project. This project proposes to improve SR 285 beginning at M.P. 0.01 in Seminole County and ending at M.P. 0.24 in Decatur County.

Seminole County, GA 2005
11748 Erickson, Luke W. Archeological Assessment of a Paulding County Resurfacing Project (CSSTP-M003-00(213))

Archeological Assessment of a Paulding County Resurfacing Project. This project consists of the resurfacing, milling, grading, and earth shoulder starting on SR 120 Connector, beginning at its intersection with SR 120 and ending at its intersection with SR 92.

Paulding County, GA 2005
11749 Rotenstein, David S. Bridge Review Sheet, BRZLB-201(10) Miller County

This is a bridge project, BRZLB-201(10), located in Miller County. The bridge is on CR 188 and crosses Kaney Head Creek. The proposed project will replace the existing structure at Kaney Head Creek with a box culvert.

Miller County, GA 1986
11750 Entorf, Robert F. Bridge Categorical Exclusion, BRSLB-1086(9) Oglethorpe County

The proposed project consists of the construction of a replacement bridge on new location over Barrow Creek and the relocation of a section of C.R. 240 south of Arnoldsville.

Oglethorpe County, GA 1991
11751 Entorf, Robert F. Bridge Categorical Exclusion, BRS-0506(5) Miller County

This is a bridge project, BRS-0506(5), located in Miller County. The bridge is on SR 45 and crosses Long Branch stream. The existing structure is 120 feet long and 24 feet wide with timber pilings, timber caps, steel stringers, and a concrete deck. The existing ROW is 200 feet.

Miller County, GA 1989