11728 Project STP-157-1(6) Proposed Center Turn Lane for SR 36, Upson County

The proposed project would add a two-way center turn lane, 2.4 km/1.5 miles in length, to SR 36 in Thomaston, Georgia.

Upson 1994
11729 Entorf, Robert F. Bridge Review Sheet, BRZLB-199(9) Meriwether County

This is a bridge project, BRZLB-199(9), located in Meriwether County. The bridge is on Coleman Road/ CR 21 and crosses Coleman Creek. The existing structure is a 31 foot long by 17 foot wide single span bridge with concrete abutments, steel beams, and a timber deck.

Meriwether 1986
11730 Paglione, Teresa L. Bridge Categorical Exclusion, BRZLB-015(14) Bartow County

This is a bridge project, BRZLB-015(14), located in Bartow County. The bridge is on CR 211 and crosses Pine Log Creek. The existing structure is a 17.5 feet wide and 48 feet long concrete bridge. The existing ROW is 40 feet.

Bartow 1990
11731 McIntosh, Paul Archaeological Assessment of Project CSSTP-M002-00(618) Toombs, Treutlen and Emanuel Counties

Archaeological Assessment of Project CSSTP-M002-00(618), Toombs, Treutlen and Emanuel Counties, Leveling, Milling, Resurfacing and Shoulder Construction on SR 297, From SR 130/SR 292 (MP 0.00) to the bridge under SR 404 (1-16) (MP 4.91) for an approximate length of 13.815 miles.

Toombs 2003
11732 Braley, Chad O. Archaeological Surveys of County Bridge Projects – BRZLB-199(4) Meriwether County

In compliance with Section 106 of the National Historic Preservation Act of 1966, the following Georgia DOT projects were surveyed for cultural resources: Georgia DOT project number BRZLB-199(4) is an in place bridge replacement project at County Road 352 which crosses Brittens Creek in Meriwethe

Meriwether 1979
11733 Bowen, William R. Bridge Review Sheet, IR-185-1(285) Muscogee County

This is a bridge project, IR-185-1(285), located in Muscogee County. The bridge is on Lindsay Creek Bypass/ I-185. The northbound bridge is a 28 feet wide by 391 feet long concrete bridge. The southbound bridge is 28 feet wide and 394 feet long. The proposed project would widen both bridges.

Muscogee 1987
11734 Erickson, Luke W. Archeological Assessment of the Franklin/Hart Counties Surfacing Project

Archeological Assessment of the Franklin/Hart Counties Resurfacing Project. This proposed project is 2.4 miles in length beginning just south of SR 17 (MP 0.0) in Hart County and ending just north of SR 17 (MP 1.7) in Franklin County on SR 17 Bu. The project consists of milling and inlay.

Franklin 2003
11735 Erickson, Luke W. Archeological Assessment of the Gwinnett, Barrow, Jackson Counties Resurfacing Project

Archeological Assessment of the Gwinnett. Barrow, Jackson Counties Resurfacing Project. This proposed project is 17.502 miles long and consists of patching, leveling, resurfacing, and shoulder building on SR 124 beginning 200' north of SR 20 (MP 16.95) and ending at SR 53 (MP 1.807).

Gwinnett 2003
11736 Braley, Chad O. Bridge Replacements and 404 Permit Requests, District Four, Lowndes County, BRMLB-4903(2)

Survey methods included a visual search of exposed ground surfaces and randomly placed shovel tests 12-18 11 deep. One of the project’s (*) was cleared by inspection of the plans; replacement is to be in-line and should not affect additional undisturbed acreage.

Lowndes 1979
11737 Paglione, Teresa L. Bridge Categorical Exclusion, BRZLB-113(4) Fayette County

This is a bridge project, BRZLB-113(4), located in Fayette County. The bridge is on CR 275/ Sherwood Road and crosses Whitewater Creek. The existing structure consists of five lines of 60 inches of CM pipe with concrete headwalls and deck. The existing ROW is 50 feet.

Fayette 1993