Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
12037 D'Avino, Gail A., Entorf, Bob P. Project STP-1022(9) Fulton County, Determination of No Undertaking

Project STP-1022(9), Fulton County: Determination of No Undertaking; the subject project would consist of the leveling and resurfacing of SR 372 in Fulton County. The proposed project would begin at Broadwell Road and would end at the Cherokee County line.

Fulton 1997
12038 D'Avino, Gail A., Entorf, Bob P. Project STP-209-1(9) Fulton County, Determination of No Undertaking

Project STP-209-1(9), Fulton County: Determination of No Undertaking; the subject project would consist of the leveling and resurfacing of SR 74 in Fulton County. The proposed project would begin at the I-85 interchange and would end at US 29/SR 14.

Fulton 1997
12039 Burnside, Jack Project STP-0692(21) Haralson County, PI # 631200

The proposed project would reconstruct SR 100 to provide a railroad grade separation in Tallapoosa. The project begins immediately south of the present SR 100 and Marble Street intersection, continues west and intersects with the realigned Daniel Street.

Haralson 1992
12040 D'Avino, Gail A., Bowen, Rowe Project MASTP-00MS(245) Douglas County, Determination of No Undertaking

Project MASTP-00MS(245), Douglas County: Determination of No Undertaking; the subject project would consist of the leveling and resurfacing of SR 92. The proposed project would begin at the Fulton County line and would end at the intersection of Flowers Drive.

Douglas 1997
12041 D'Avino, Gail A., Entorf, Bob P. Project IM-00MS(154) Elbert, Habersham, White, Union, Rabun, Hall, and Jackson Counties; Determination of No Undertaking

Project IM-00MS(154), Elbert, Habersham, White, Union, Rabun, Hall and Jackson counties: Determination of No Undertaking; the subject project would consist of upgrading end treatments of guardrail at various locations.

Elbert 1996
12042 Newman, Robert D., Handley, Brent M. An Intensive Cultural Resource Assessment Survey of Jaycee Landing Wayne County, Georgia

In March to May 2019, Environmental Services, Inc., (ESI) conducted a cultural resource assessment survey at the Jaycee Landing project, in Wayne County, Georgia (Figure 1.1).

Wayne 2019
12043 D'Avino, Gail A., Entorf, Bob P. Project STP-00MS(230) Meriwether County, Determination of No Undertaking

Project STP-00MS(230), Meriwether County: Determination of No Undertaking; The subject project would consist of leveling and resurfacing of SR 173 in Meriwether County.

Meriwether 1997
12044 D'Avino, Gail A., Entorf, Bob P. Project NH-2-3(15) 01 Bibb County, Determination of No Undertaking

Project NH-2-3(15)01, Bibb County: Determination of No Undertaking; the subject project would consist of the leveling and resurfacing of SR 11 in Bibb County.

Bibb 1997
12045 D'Avino, Gail A., Entorf, Bob P. Project NH-007-1(67) Grady/Thomas Counties, Determination of No Undertaking

Project NH- 007 - 1(67), Grady/ Thomas Counties: Determination of No Undertaking. The subject project would consist of the leveling and resurfacing of US 84/ SR 38 in Grady and Thomas Counties.

Grady 1997
12046 Hart, Barry D. Archaeological Assessment of Project FR-068-1(23), Tattnall County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project FR- 068-1(23), Tattnall County has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NR

Tattnall 1984