Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
3008 Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of SR 216 over Carter Creek, Randolph County, Georgia

Original: The proposed project would also involve the realignment of SR 216 east of its current location for a distance of approximately 4,192 feet. As a result, the new bridge structure would be located approximately 85 feet east of the current bridge.

Randolph 2005
3009 Erickson, Luke W. Archeological Survey of project CSSTP-0007-00(116), Cobb County

This project proposes to upgrade the traffic signal equipment on SR 280/South Cobb Drive from 1-285 to Pat Mell Road. The intersections involved will be all intersections within the termini that have existing signals.

Cobb 2005
3010 Pietak, Lynn Marie Phase I Archaeological Survey of ATMS Fiber Optic Line Route along the Lawrenceville/Suwanee Highway, Gwinnett County, Georgia

The Lawrenceville-Suwanee Road ATMS project expands upon the current Intelligent Transportation Systems (ITS) in Gwinnett County.

Gwinnett 2005
3011 Norwood, S. Lorraine Draft Report for Archaeological Survey for Proposed Intersection Improvements on Kimball Bridge Road at Waters Road, Fulton County, Georgia

Archaeological survey for one operational intersection (Kimball Bridge Road at Waters Road) improvement through roadway reconstruction and right of way realignment.

Fulton 2005
3012 Battle, Daphne Owens Forest Park Main Street Revitalization, Clayton County, Georgia

The project consists of the construction of 6 to 10 foot-wide sidewalks, with curb and gutter drainage, lighting, benches, trash receptacles, thermoplastic stripping at road crossings, traffic light mast arms, and bicycle parking racks in downtown Forest Park.

Clayton 2005
3013 Pomfret, James Archaeological Survey of Project STP-591(9), Coffee County

Project STP-591(9) would widen SR 158, just west of Douglas, from two lanes to four lanes. The proposed project would begin approximately 0.5 mile west of Woodrow Stone Road/CR 513 and end at SR 206. Existing right-of-way is 75 feet and the proposed right-of-way would be 150 feet.

Coffee 2005
3014 Pomfret, James Archaeological Survey of Project STP-0000-00(399), Fayette County

The proposed project would realign CR 375/Kingswood Drive to intersect SR 92 opposite of CR 553/Hilo Road and add right and left turn lanes on SR 92 at the new intersection. A cul-de-sac would be constructed at the end of existing CR 375/Kingswood Drive.

Fayette 2005
3015 Erickson, Luke W. Archaeological Survey of Project CSMSL-0006-00(258), Chattahoochee County

This project proposes to install radar devices, pavement loops, and overhead LED signs for the purpose of detecting and informing motorists of their speed as they approach the intersection of SR 520 at SR 1.

Chattahoochee 2005
3016 Duff, Eric Anthony, McIntosh, Paul Archaeological Assessment of Project CCSTP-0007-00(069), Douglas County

The proposed project would improve the intersection of SR 5/Bill Arp Road with CR 192Bright Star Road. SR 5/Bill Arp Road will be symmetrically widened about the centerline to provide an approximately 200' left turn lane and also a right turn lane.

Douglas 2005
3017 Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of the Proposed Bridge Replacement: SR 1/US 27 over Mountain Creek, Harris County, Georgia

Original Description: the proposed bridge would be constructed on the existing roadway alignment and would be approximately 120 feet long and 44 feet wide. The new bridge would accommodate two 12-foot travel lanes and two 10-foot shoulders.

Harris 2005