3048 Price, George D. Phase I Archaeological Survey for the Big Shanty Road Connector, Cobb County, Georgia

In late August 2004, Greenhouse Consultants Incorporated began a Phase I Archaeological Survey for proposed widening and reconstruction of existing portions of Big Shanty Road and construction of the Big Shanty Road Connector in Cobb County, Georgia.

Cobb 2005
3049 D'Angelo, James J. Phase I Cultural Resource Survey for Proposed Gaines Mill Pump Station Site, Hall County, Georgia

TRC conducted a Phase I cultural resources survey for the proposed Gaines Mill Pump Station and access road in Hall County, Georgia, on October 28, 2004. The project area consists of approximately 2900 linear feet of access road and a 150 x 150 foot lot for the pump station.

Hall 2005
3050 Andrews, Erin L. Archaeolgical Survey for Proposed Intersection Improvements on Webb Bridge Road//CR 70 at Park Bridge/Shirley Bridge, Fulton County, Georgia

At the request of Kennedy Engineering & Associates Group, LLC, on behalf of Georgia Department of Transportation (GDOT), Terracon conducted a Phase I Archaeological Survey of one proposed GDOT intersection improvement (HPP-0000-00[261 ]).

Fulton 2005
3051 Athens, William P. Phase I Cultural Resources Survey Archeological Inventory of the Proposed 24 inch O.D. (Outside Diameter) Cypress Natural Gas Company, L.L.C., Cypress Pipeline Project, Chatham, Bryan, Liberty, Long, McIntosh, Glynn, Wayne, Camden, Charlton Counties, GA

This document presents the results of Phase I cultural resources survey and archeological inventory of the 195.59 km (121.54 mi) Georgia portion of the proposed Cypress Pipeline Project corridor and its associated access roads and extra-workspaces in Chatham, Bryan, Liberty, Long, McIntosh, Glynn

Bryan 2005
3052 Gresham, Thomas H. Archeological Survey of the Dawson to Cuthbert 115 kV Transmission Line, Randolph and Terrell Counties, Georgia

In November and December of 2004, Southeastern Archeological Services, Inc.

Randolph 2005
3053 Silliman, Garrett W., Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of SR 268 over Hall's Creek, Coffee County, Georgia

A short form for negative findings for an addition to Phase I Archeological Survey of SR 268 over Hall's Creek, Coffee County, Georgia. The project is located on the Broxton South Quadrangle.

Coffee 2005
3054 Silliman, Garrett W., Pietak, Lynn Marie Addendum to the Phase I Archaeological Survey of SR 144 over Watermelon Creek, Tattnall

Original project description: The proposed project would replace the existing bridge over Watermelon Creek with a two-lane bridge on new alignment. The proposed alignment would be located north of the existing bridge with a centerline-to-centerline offset of approximately 60 feet.

Tattnall 2005
3055 Jordan, William R. Phase I Archaeological Survey of the Lavista Road (SR236) Pedestrian and Bicycle Improvements

PBS & J plans to construct pedestrian and bicycle improvements on the north and the south sides of Lavista Road, extending 1.01 miles (1.63 km), from Northlake Parkway to Harobi Drive.

DeKalb 2005
3056 Mauldin, Heather, Joseph, Joseph W. Phase I Archaeological Survey of the Proposed Improvement to SR 20, Gwinnett and Walton Counties, Georgia

This study is a Phase I survey of the proposed impact area of widening SR 20 in Gwinnett and Walton Counties between the intersections of Highway 81 and Oak Grove Road.

Gwinnett 2005
3057 Smith, Patrick Addendum to Phase I Archaeological Survey of the Proposed Stanton Springs Parkway in Morgan, Newton, and Walton Counties, Georgia

This addendum report addresses a realignment of the westernmost 3657 feet of the proposed Stanton Springs Parkway.

Morgan 2005