Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
2988 Erickson, Luke W. Archeological Survey of an Emergency Repair Project in Stephens County

This emergency project proposes to repair a severe slide which has resulted in cracked and damaged sections of ditch paving near M.P. 56.7 on the northbound side of SR 365 in Stephens County, Georgia. The slide is approximately 30', wide and 150' long.

Stephens County, GA 2005
2989 Erickson, Luke W. Archeological Survey of Project CSSTP-0006-00(685), White County

This project proposes to remove the existing guardrails along SR 17/75 from MP 6.43 to MP 7.07 and replace them with cable barriers. All work will take place within the existing right-of-way. The total length of this project is 0.64 mile.

White County, GA 2005
2990 Erickson, Luke W. Archeological Survey of Two Emergency Repair Projects in Habersham County

The first emergency project proposes to repair a severe slide which has resulted in cracked and damaged sections of ditch paving near M.P. 15.4 on the southbound side of US 441 in Habersham County, Georgia. The slide is approximately 20' wide and 100' long.

Habersham County, GA 2005
2991 Erickson, Luke W. Archeological Survey of project CSSTP-0007-00(290), Clayton/Henry County

This project proposes to upgrade all traffic signal equipment (signal heads, controllers, ped heads, ramps, loops, etc.) and communication equipment at 19 intersections along Tara Boulevard/US 19/41 beginning at Arrowhead Road in Clayton County and ending at Richard Petty Boulevard in Henry Coun

Henry County, GA 2005
2992 Erickson, Luke W. Archaeological Reassessment of Project NH-IM-185-1(317), Muscogee County

This project was originally surveyed and concurrence received in September of 1997. The project proposes to add an additional inside lane to 1-185. The existing right-of-way on 1-185 is approximately 200', with approximately 50' of additional right-of-way required for project implementation.

Muscogee County, GA 2005
2993 Erickson, Luke W. Archeological Survey of project CSSTP-0007-00(117), Fulton County

This project proposes to upgrade all traffic signal equipment (signal heads, controllers, ped heads, ramps, loops, etc.) and communication equipment at 5 intersections along SR 6/Camp Creek Parkway from 1-285 to Washington Road.

Fulton County, GA 2005
2994 Erickson, Luke W. Archeological Survey of project CSSTP-0007-00(118), Rockdale County

This project proposes to upgrade all traffic signal equipment (signal heads, controllers, ped heads, ramps, loops, etc.) and communication equipment at 4 intersections along SR 138 from Miller's Chapel/Parker Road to SR 212.

Rockdale County, GA 2005
2995 Erickson, Luke W. Archeological Survey of project CSSTP-0007-00(120), Fulton County

This project proposes to upgrade all traffic signal equipment (signal heads, controllers, ped heads, ramps, loops, etc.) and communication equipment at 33 intersections along SR 140/SR 9/Holcomb Bridge Road/Crossville Road from River Exchange to Steeple Run/Wildwood Road.

Fulton County, GA 2005
2996 Erickson, Luke W. Archeological Survey of project CSSTP-0007-00(114), Cobb County

This project proposes to upgrade all traffic signal equipment (signal heads, controllers, ped heads, ramps, loops, etc.) and communication equipment at 16 intersections along SR 8/Veteran's Memorial Highway from Jefferson Street to Discovery Boulevard.

Cobb County, GA 2005
2997 Erickson, Luke W. Archeological Survey of project CSSTP-0007-00(115), Fulton County

This project proposes to upgrade all traffic signal equipment (signal heads, controllers, ped heads, ramps, loops, etc.) and communication equipment at 9 intersections along SR 154/Campbellton Road from 1-285 to Suber/Union Road.

Fulton County, GA 2005