Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
6065 Mustonen, Heather Archaeological Survey of GDOT Project Surplus Property along I-985 and SR 53, Hall County

The proposed project consists of a land swap between the Georgia Department of Transportation and Hall County. The two properties are both located in the southeast quadrant of 1-985 and SR 53/Mundy Mill Road, along Wallis Road.

Pickens 2010
6066 Pomfret, James Archaeological Reevaluation of Project CSNHS-0007-00(420), McIntosh County

The proposed project would replace the bridge on SR 57/Wiregrass Trail over 1-95 in McIntosh County. The existing right-of-way on SR 57/Wiregrass Trail is 200 feet and the maximum proposed right-of-way would vary between 200-350 feet.

Cobb 2010
6067 Gale, Sara H. Archeological Survey of Project STP-0003-00(625), Bleckley County

This project proposes to widen and reconstruct the Cochran Bypass, SR 87, in Bleckley County.

Camden 2010
6068 Mustonen, Heather Archeological Reevaluation of GDOT Project CSSTP-0008-00(409), Intersection Improvements to State Route 26/U.S. Highway 80 at State Route 30/U.S. Highway 280 in Blighton, Bryan County

The proposed project would consist of the intersection improvement of State Route 26/U.S. Highway 80 with State Route 30/U.S. Highway 280 in Blitchton (see attached location map). The project would provide left turn lanes on State Route 26/U.S. Highway 80 approaching State Route 30/U.S.

Cobb 2010
6069 Braley, Chad O. Archeological Resurvey of Wrightsboro Road and Barton Chapel Road, Richmond County

The current plan is to shift the alignment of Barton Chapel Road about 490 ft to the east on Wrightsboro Road, so that it aligns with Augusta West Parkway. The realignment begins on Barton Chapel Road about 1250 ft south of Wrightsboro Road.

Irwin 2010
6070 Gale, Sara H. Archeological Survey of Surplus Parcel 92R and the SR 16 and I-75 Interchange, Project STP-IM-022-1(26), Butts County

The proposed project is the identification of surplus property owned by the Georgia Department of Transportation that will be placed on the market by the Department's Right-of-Way Office.

Jasper 2010
6071 Gage, Matthew D., Herrmann, Nicholas P. Archaeological Site Identification and Erosion Monitoring for the TVA Reservoir Operation Compliance Project: 2005-2009 Field Seasons on Portions of Blue Ridge, Chatuge, Cherokee, Fontana, Hiwassee, Norris, Nottely, Pickwick, South Holston, Watauga Reserv

The Archaeological Research Laboratory (ARL) at the University of Tennessee's Department of Anthropology has been contracted by the Tennessee Valley Authority (TVA) to conduct an archaeological and erosion monitoring survey of portions of Blue Ridge, Chatuge, Cherokee, Fontana, Hiwassee, Norris,

2009
6072 Gale, Sara H. Archeological Survey of Project STP-0004-00(292), Greene County

The proposed project would consist of improvements to the existing SR 12/US 278, CR 110/Brickhouse Road/Cunningham Road intersection between the cities of Greensboro and Union Point.

Laurens 2010
6073 Joseph, Joseph W. Phase I Archaeological Survey of South LaGrange Loop

A Phase I archaeological survey was conducted in response to proposed changes to the South LaGrange Loop in Troup County, GA. The project entails the addition of a short corridor linking the main road to a property to the west.

Coffee 2010
6074 Pietak, Lynn Marie Addendum to Arch. Survey of Proposed Streetscapes to Roswell Street (SR120), Marietta

Improvements of existing 4-ft. wide sidewalks on both sides of Roswell Street Project includes new 8-ft. sidewalks and 8-ft. wide strip for landscaping and furniture. Four signalized intersections will be improved with handicap ramps.

Newton 2010