Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
6055 D'Angelo, James J., Thomas, Larissa A. Archaeological Investigations For Phase II of the Oconee Riverfront Park Along the Prosed Oconee River Greenway in Baldwin County, Georgia

TRC conducted archaeological investigations to assist the Oconee River Greenway Authority with permitting associated with the second phase of the proposed Oconee Riverfront Park and Greenway in Milledgeville, Baldwin County, Georgia.

Fulton 2010
6056 Silliman, Garrett W., Quirk, Phillip W. The Phase I Archaeological Survey of the Proposed Improvements to Douthit Ferry Road, Bartow County, Georgia

In January and February 2009, Edwards-Pitman Environmental, Inc. (EPEI) conducted an archaeological survey for the proposed improvements to Douthit Ferry Road in Bartow County.

Bartow 2009
6057 Hise, Alana Phase I Archaeological Survey of the Proposed ATMS and Streetscapes on Old National Highway, Fulton County, Georgia

On March 12 and 17, 2009, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed ATMS project and Streetscapes project on Old National Highway in Fulton County, Georgia.

Cobb 2010
6058 Phase I Archaeological Survey of the Proposed Widening and Reconstruction of SR 92/ Lake Acworth Drive in Cobb County, Georgia

In May and September, 2008, URS Corporation performed a Phase I archaeological survey for the proposed widening and reconstruction of SR 92 between SR 3/US 41 and Cowan Road in Cobb County, Georgia.

Chatham 2010
6059 Dunn, Shannon M. Phase I Archaeological Resources Survey of the Truman Parkway/ President Street Overpass

Between 6 and 10 April 2009, Brockington and Associates, Inc. conducted a Phase I archaeological resources survey of proposed changes to the intersection of Truman Parkway and President Street in Savannah, Chatham County, Georgia.

Rockdale 2010
6060 Stoops, Richard W. Phase I Arcaheological Surevy for Proposed Improvements to Intersection at La Vista and Oak Grove Roads, DeKalb County, Georgia

The Georgia Department of Transportation proposes to improve the intersection of LaVista and Oak Grove roads, approximately 5.6 km (3.5 miles) north of Decatur, Georgia.

Fulton 2010
6061 Whitley, Thomas G. Phase 1 Survey, Proposed Widening of SR 53, Pickens County, Georgia

The proposed project would consist of the widening and reconstruction of SR 53 in Pickens County. The project begins at the intersection of SR 515 and SR 53 and continues to the intersection of CR 243/Industrial Boulevard and Burnt Mountain Road.

DeKalb 2010
6062 Lotti, Teresa Ann Archaeological Assessment of Project CSNHS-M003-00(976), Twiggs, Bleckley, and Laurens Counties

The proposed project would consist of the removal of the outside lanes on 1-16, in both directions, to base repair and replace the lanes with concrete pavement beginning at the 1-16 and SR 96 intersection in Twiggs County and end at the 1-16 and SR 26 intersection in Laurens County.

White 2010
6063 Gale, Sara H. Archeological Survey of Surplus Parcel 29A adjacent to I-75, Project I-75-2(32), Spalding County

The proposed project is the identification of surplus property owned by the Georgia Department of Transportation that will be placed on the market by the Department's Right-of-Way Office.

Morgan 2010
6064 Lotti, Teresa Ann Archaeological Assessment of Project CSNHS-M003-00(956), Laurens and Treutlen Counties

The proposed project would consist of the removal of the outside lanes on 1-16, in both directions, to base repair and replace the lanes with concrete pavement beginning at the 1-16 and SR 26 intersection in Laurens County and end at the 1-16 and SR 29 intersection in Treutlen County.

Gordon 2010