7584 Historic Hydro-Engineering Report North Georgia Project (FERC #2354)

This report documents and evaluates the six hydroelectric generating plants of the North Georgia Project. The project is owned and operated by the Georgia Power Company and is licensed as Federal Energy Regulatory Commission (FERC) Project #2354.

Taylor 1993
7585 Lotti, Teresa Ann Archaeological Reassessment of Project BR-0000-00(451), Grady County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project BR-0000-00( 451), Grady County has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (N

Grady 1976
7586 Erickson, Luke W. Archaeological Assessment of Project PR-158-2(131)

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, and the Georgia Environmental Policy Act of 1991, project PR-158-2(131), Grady County has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion

Sumter 1977
7587 Cultural Resource Management Plan for the Langdale Hydroelectric Generating Project FERC (#2341) and Riverview Hydroelectric Generating Project FERC (#2350) Chambers County, Alabama and Harris County, Georgia

In August 1987, the Georgia Power Company began the first stage consultation for the relicensing of the Langdale and Riverview Hydroelectric Projects (FERC #2341 and 2350, respectively). This action occurred as a direct result of the Company's compliance with 18 CFR Ch. 1.

Harris 1990
7588 Caldwell, Joseph Ralston Proposal for Historical and Archaeological Investigations in the Wallace Reservoir of the Georgia Power Company

The proposed Wallace Dam at Laurens Shoals will flood parts of the Oconee and Apalachee Valleys to a point 435.6 feet above sea level. Counties to be affected by flooding will be Greene, Hancock, Morgan and Putnam. The Georgia Power Company plans to have the dam completed in 1975.

Greene 1972
7589 Rock, Carolyn Phase I Archaeological Survey of the Proposed Jekyll Island Children and Youth Conference Center Project Area

Between 12 and 14 December 2013, Brockington and Associates, Inc. conducted an intensive Phase I archaeological survey of the proposed Jekyll Island Children and Youth Conference Center project area in Glynn County, Georgia.

Bibb 2001
7590 Butler, C. Scott Shovel Test Archaeological Investigations Along a 500-Meter Segment of the East Point-Villa Rica Primary/Gordon Foods Transmission Line Right-of-Way

On June 4, 2014, Brockington and Associates, Inc.

Houston 2001
7591 Franz, David M., Bragg, Rachel Phase I Cultural Resources Survey of the 93-Acre Buffington Road Site

From January 3 to January 6, 2014, Brockington and Associates, Inc. (Brockington; Norcross, Georgia), conducted a Phase I cultural resources survey of the 93-acre (37.6-hectare) Buffington Road Site in Union City, Georgia.

Henry 2002
7592 Braley, Chad O., Smith, Robin L., Borremans, Nina, Reitz, Elizabeth J. Coastal Adaptations in Southeast Georgia: Ten Archaeological Sites at Kings Bay

Secondary archeological testing at six prehistoric and four historic sites at Kings Bay, Camden County, Georgia is documented in this report. The u.s.

Camden 1981
7593 Dye, Melissa M., Gorman, Rebecca D. An Intensive Cultural Resource Assessment Survey of the Terrapoint/Belfast Commerce Centre, Bryan County, Georgia

In February of 2011, and March and April of 2012, Environmental Services, Inc. (ESI) performed an intensive cultural resource assessment survey of the ±1,500.8-acre TerraPointe/Belfast Commerce Centre, on behalf of TerraPointe Service Inc.