Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
7614 Koch, Christopher P. Fitzgerald Depot Project

The 112 year old two-story Mission Revival railroad depot was originally built by the Atlanta, Birmingham and Atlantic Railroad and sits on city owned property adjacent to the CSX Railroad.

Stephens 2013
7615 Moss, Richard A. Reevaluation of the Northwest Corridor Project, Phase 1, Cobb County, Georgia

This reevaluation examined only changes since previous archaeological survey to the five areas identified for initial construction (Phase 1 ). This project is a Design, Build, Finance (DBF) project and has been procured as a Public-Private Partnership (P3).

Burke 2010
7616 Moss, Richard A. Reevaluation of the Northwest Corridor Project, Phase II, Cobb County, Georgia

This project is a Design, Build, Finance (DBF) project and has been procured as a Public-Private Partnership (P3). As part of the design-build process, the P3 Developer has identified five areas for Phase 2 construction.

Richmond 2010
7617 Williamson, Elizabeth E., Wood, W. Dean Cultural Resources Survey of FY2015 Projects on the Chattooga River District, Habersham, Stephens, and Rabun Counties Georgia

Southern Research, Historic Preservation Consultants, Inc., has completed a cultural resources survey of 1,095 acres of timber stands and 5.89 miles of Off-Highway Vehicle (OHV) trails for the Fiscal Year 2015 projects on the Chattooga River District of the Chattahoochee National Forest, in Rabu

Taylor 1974
7618 Lovett, Elizabeth E., Sipes, Eric D. Archaeological Site Delineation and Limited Testing at Nine Sites on the Eastman-N. Dublin 230kV Transmission Line GTC Project No. P85823 (WA #12)

In June 2011, Southern Research, Historic Preservation Consultants, Inc.

Worth 1975
7619 Elliott, Daniel T., Jones, Joel, Ledbetter, Jerald, Gresham, Thomas H. Archaeological Phase I/II Survey of Proposed Improvements to Jonesboro Road, Clayton and Henry Counties, Georgia

The Georgia Department of Transportation (GDOT) intends to widen and improve an approximately 12-km (7.5-mi) length of Jonesboro Road, from its intersection with Interstate Highway 75 in Henry County westward to U.S. Highway 19/41 in Clayton County.

Putnam 1977
7620 Owens, Daphne L. Updated Archaeological Survey for the Monticello Sidewalk Improvement Project

The proposed projects would provide sidewalk improvements to several corridors in Monticello outlined below. The project would also provide gateway signs at 2 intersections: 1) Maddux Stat College St; and, 2) Funderburg Dr at MLK Jr Dr.

Paulding 1984
7621 Williams, Siska GDOT Archaeological Assessment In-House Survey Report SR 316/US29 @ SR 81 Grade Separation. Reevaluation.

Project CSNHS-0008-00(429) is located approximately four miles south of the City

Paulding 1985
7622 Williams, Siska GDOT Archaeological Assessment In-House Survey Report US 27/SR 1 and South Cuthbert Street

This project will re-construct the existing deficient roadway drainage system of US 27/SR 1 and South Cuthbert Street by using larger and/or dual pipes, and corresponding new drainage structures.

Polk 1985
7623 Harrell, Jill Kingham, Wynn, Jack T. Chattahoochee Oconee National Forest Heritage Resource Management Program: 1997 Annual Report

This report covers the fiscal year 1997 activities of the Heritage Program of the Chattahoochee and Oconee National Forests from October 1, 1996 through September 30, 1997.

1997