Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
9969 Baughman, Pamela J. Addendum Survey to the Phase I for the Bridge Replacement on CR 2/Bethany Church Road at Turkey Creek Tributary, Harris County, Georgia

The proposed project involves the replacement of the existing bridge with a 120 foot (ft) long by 29.75ft wide pre-stressed concrete box beam bridge.

Harris 2017
9970 Baughman, Pamela J. Addendum Survey to the Phase I for the Bridge Replacement on CR 248/0 Street at Palmetto Creek, Harris County, Georgia

The proposed project involves the replacement of the existing bridge with an 80 foot (ft) long by 26.5ft wide pre-stressed concrete box beam bridge.

Harris 2017
9971 Keith, Scot J. Phase I Archaeological Survey, Low Impact Bridge Program, Bridge 015-5014-0, Norton Road over Tom's Creek, Bartow County, Georgia

The project involves the replacement of Bridge 015-5014-0, which carries Norton Road over Tom's Creek in Bartow County. The project is included In GDOT's Low Impact Bridge Program (LIBP). The existing bridge, constructed in 1950, is structurally deficient and will be replaced.

Bartow 2016
9972 Keith, Scot J. Phase I Archaeological Survey, Low Impact Bridge Program, Bridge 015-5041-0, Littlefield Road over Cedar Creek, Bartow County, Georgia

This project involves the replacement of Bridge 015-5041-0, which carries Littlefield Road over Cedar Creek in Bartow County. The project is Included in GDOT's Low Impact Bridge Program (LIBP). The existing bridge, built in 1939, is structurally deficient and will be replaced.

Bartow 2016
9973 Hahs, David G. Phase I Archaeological Survey for the Bridge Replacement of CR 215 over Wiiliams Creek

The proposed project would replace the existing structurally deficient bridge, Structure 10 145-5032-0, on County Road (CR) 215 (Fortune Hole Road) over Williams Creek, approximately 4 miles southeast of Hamilton, Georgia. The project begins approximately 3 miles east of the U.S.

Harris 2017
9974 DuBois, Autumn 9GAR00718-A N Ellis Street & E Church Street, Camilla, Mitchell County, Georgia. ECA Project No. T1197

Environmental Corporation of America’s (ECA) client, Mobilitie, LLC, is proposing to construct a pole as described in the following FCC Form 620, New Tower (NT) Submission Packet.

Mitchell 2017
9975 Beazley, Matthew 9GAXR00149/AT68XC005A Off Honeysuckle Road, Monticello, Jasper County, Georgia, ECA Project No, S3804

Environmental Corporation of America’s (ECA) client, Mobilitie, LLC, is proposing to construct a pole as described in the following FCC Form 620, New Tower (NT) Submission Packet.

Jasper 2017
9976 Jones, Paul L., Lewis, Clifford Thomas Phase II Archaeological Testing of Site 9PA517, Dalton Expantion Project, Paulding County, Georgia. FERC Docket No. CP15-17-000

Transcontinental Gas Pipeline Company, LLC (Transco) is seeking a Certificate of Public Convenience from the Federal Energy Regulatory Commission (FERC) pursuant to Section 7 (c) of the Natural Gas Act for the construction and operation of a 111.7-mile natural gas pipeline (the Project) in northw

Paulding 2016
9977 Leone, Karen L., VanDyke, Ryan M. Archaeological Survey in Support of Norfolk Southern Railway's Completion of Section 106 Requirements for the Waysidepole Upgrade Project Associated with Positive Train Control Site CP Circle S 293.80 in the City of Atlanta, Fulton County, Georgia

In December 2015, HRA Gray & Pape, LLC., of Houston, Texas, at the request of Golder

Associates Inc. and Norfolk Southern Railway Company, conducted a field survey of the proposed location of Positive Train Control tower CP Circle S 293.80 in Atlanta, Fulton

Fulton 2016
9978 Leone, Karen L., VanDyke, Ryan M. Archaeological Survey in Support of Norfolk Southern Railway's Completion of Section 106 Requirements for the Waysidepole Upgrade Project Associated with Postive Train Control Site Spring Main H 152.60 in the City of Atlanta, Fulton County, Georgia

In December of 2015, HRA Gray & Pape, LLC., of Houston, Texas, at the request of Golder

Associates Inc. and Norfolk Southern Railway Company, conducted a field survey of the proposed location of Positive Train Control tower Spring Main H 152.60 in Atlanta, Fulton

Fulton 2016