2869 |
Silliman, Garrett W., Pietak, Lynn Marie |
Phase I Archaeological Survey of the Athens-Ben Epps Airport Expansion Project Area, Clarke County, Georgia |
During August and September 2004, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed location for the Athens-Ben Epps Airport expansion project. A total of approximately 148 acres is included. |
Clarke County, GA |
2004 |
2897 |
Silliman, Garrett W., Pietak, Lynn Marie |
Phase I Archaeological Survey of One Signal Design Project Area in Rome, Floyd County, Georgia |
None Present. |
Floyd County, GA |
2004 |
2962 |
Silliman, Garrett W., Pietak, Lynn Marie |
Addendum to Intensive Archaeological Field Survey if the Cobb Creek Bridge Replacement, Toombs County, Georgia |
As the result of recent design changes, the proposed project would begin approximately 1,315 feet west of Cobb Creek and end approximately 1,361 feet east of Cobb Creek, for a total project length of approximately 2,675 feet (0.50 mile). |
Toombs County, GA |
2005 |
2964 |
Silliman, Garrett W., Pietak, Lynn Marie |
Addendum to Phase I Archaeological Survey of CR 107/Howell Bridge Road Over Sharp Mountain Creek, Cherokee County |
Original: The proposed project would replace the existing bridge over Sharp Mountain Creek with a new 200-foot long and 38-foot wide bridge on new alignment located to the north, but adjacent to the existing bridge. |
Cherokee County, GA |
2005 |
3038 |
Silliman, Garrett W., Pietak, Lynn Marie |
Addendum to Intensive Archaeological Survey of the Proposed Big Horse Creek Bridge Replacement, Telfair County, Georgia |
In February 2005, Edwards-Pitman Environmental, Inc. (EPEI) conducted additional survey at the site of the proposed bridge replacement over Big Horse Creek, Telfair County, Georgia. The total length of the redesigned project is 0.50 miles. |
Telfair County, GA |
2005 |
3039 |
Silliman, Garrett W., Pietak, Lynn Marie |
Addendum to Phase I Archaeological Survey of CR 781/Staten Road over the Withlacoochee River, Lowndes County, Georgia |
In January and February 2005, Edwards-Pitman Environmental, Inc. (EPEI) conducted additional survey at the site of the proposed bridge replacement over the Withlacoochee River, Lowndes County, Georgia. |
Lowndes County, GA |
2004 |
3042 |
Silliman, Garrett W., Pietak, Lynn Marie |
Phase I Archaeological Survey of the Proposed East Hiram Parkway Project area, Paulding County, Georgia |
During November 2004, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed location for the East Hiram Parkway project. The total length of the project is approximately 2.7 miles. |
Paulding County, GA |
2005 |
3053 |
Silliman, Garrett W., Pietak, Lynn Marie |
Addendum to Phase I Archaeological Survey of SR 268 over Hall's Creek, Coffee County, Georgia |
A short form for negative findings for an addition to Phase I Archeological Survey of SR 268 over Hall's Creek, Coffee County, Georgia. The project is located on the Broxton South Quadrangle. |
Coffee County, GA |
2005 |
3054 |
Silliman, Garrett W., Pietak, Lynn Marie |
Addendum to the Phase I Archaeological Survey of SR 144 over Watermelon Creek, Tattnall |
Original project description: The proposed project would replace the existing bridge over Watermelon Creek with a two-lane bridge on new alignment. The proposed alignment would be located north of the existing bridge with a centerline-to-centerline offset of approximately 60 feet. |
Tattnall County, GA |
2005 |
3058 |
Silliman, Garrett W., Pietak, Lynn Marie |
Addendum to Phase I Archaeological Survey of SR 90 over Little House Creek, Ben Hill County, Georgia |
The project is located approximately seven miles north of Fitzgerald, Georgia. The project would begin approximately 900 feet southeast of Little House Creek, and end approximately 1,150 feet northwest of Little House Creek. The project would be approximately 2,050 feet long (0.39 mile). |
Ben Hill County, GA |
2005 |