3105
|
Silliman, Garrett W., Pietak, Lynn Marie
|
Addendum to Archaeological Survey of the Proposed Bridge Replacement at SR 36 over Buck Creek, Lamar County, Georgia
|
On March 21, 2005, staff from Edwards-Pitman Environmental, Inc. (EPEI) revisited the location of a proposed bridge replacement project in Lamar County, Georgia. (Figure 1). The bridge is located on State Route 36 (SR 36) and crosses Buck Creek.
|
Lamar
|
2005
|
3106
|
Silliman, Garrett W., Pietak, Lynn Marie
|
Addendum to Phase I Archaeological Survey of SR 77 at SR 368 and CR 242, Elbert County, Georgia
|
On December 13 and 14, 2004, and January 28, 2005, staff from Edwards-Pitman Environmental, Inc. (EPEI) revisited the location of a proposed intersection improvement/realignment project roughly three miles north of the City of Elberton in Elbert County, Georgia. (Figure 1).
|
Elbert
|
2005
|
3138
|
Silliman, Garrett W., Pietak, Lynn Marie
|
Addendum to an Arcaeological Survey of the Propsed Lewis Road Improvements Project Area, Cobb County, Georgia
|
This document is an addendum to an Archaeological Survey of the Proposed Lewis Road Improvements Project Area, Cobb County, Georgia, the Austell quad. Original: the proposed project would consist of roadway improvements to Lewis Road in the city of Powder Springs.
|
Cobb
|
2005
|
3155
|
Silliman, Garrett W., Pietak, Lynn Marie
|
Phase I Archaeological Survey of Five Sidewalk Expansion Locations, Dekalb County, Georgia
|
The proposed project includes five sidewalk improvement areas: along Briarcliff Road, from N.
|
DeKalb
|
2005
|
3156
|
Silliman, Garrett W., Pietak, Lynn Marie
|
Addendum to Intensive Archaeological Survey of the Pobiddy Road Bridge Replacement, Talbot and Upson Counties, Georgia
|
Original: The project consists of 0.66 mile of bridge replacement on CR 172/Pobiddy Road over the Flint River. The proposed improvements would replace the existing bridge with a new structurally adequate bridge.
|
Talbot
|
2005
|
3158
|
Silliman, Garrett W., Pietak, Lynn Marie
|
Phase I Archaeological Survey of Flakes Mill Road over the South River, Dekalb County, Georgia
|
The proposed project would consist of the replacement of the existing Flake's Mill Road Bridge over the South River in DeKalb County approximately 1.25 miles south of the intersection of Flakes Mill Road and Flat Shoals Parkway.
|
DeKalb
|
2005
|
3159
|
Silliman, Garrett W., Pietak, Lynn Marie
|
Phase I Archaeological Survey of Atlanta Road over the Chattahoochee River , Cobb and Fulton Counties, Georgia
|
The proposed project would replace the existing two lane bridge on Atlanta Road over the Chattahoochee River with a 4-lane bridge new structure built on an offset alignment immediately to the west.
|
Cobb
|
2005
|
3163
|
Silliman, Garrett W., Pietak, Lynn Marie
|
Phase I Archaeological Survey of SR 81 at CR 309/653 and SR 162 Project Area, Newton County
|
The proposed project involves improvements to several intersections with SR 81 west of Porterdale, Georgia.
|
Newton
|
2005
|
3167
|
Silliman, Garrett W., Pietak, Lynn Marie
|
Phase I Archaeological Survey of Proposed Improvements to Old Covington Highway, Rockdale County, Georgia
|
The proposed project would widen Old Covington Highway from a narrow two lane facility with no roadway shoulders to a three lane facility with two 12 foot travel lanes and a 14 foot center turn lane.
|
Rockdale
|
2005
|
3174
|
Silliman, Garrett W., Pietak, Lynn Marie
|
Phase I Archeaological Survey of the Proposed Carter Hill Substation Project Area, Barrow County, Georgia
|
On April 15, 2005, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed location for the Carter Hill Substation.
|
Barrow
|
2005
|