3201 Banguilan, Alvin J., Silliman, Garrett W. Phase I Archaeological Survey of the Battle Creek Road and Mt. Zion Boulevard Roadway Improvements, Clayton County, Georgia

Report short form for negative findings for Phase I Archaeological Survey of the Battle Creek Road and Mt. Zion Boulevard Roadway Improvements, Clayton County, Georgia. The project is located on the Jonesboro Quadrangle.

Clayton 2005
3265 Banguilan, Alvin J., Silliman, Garrett W. Phase I Archaeological Survey of Warm Springs Road Bike Trail, Muscogee County, Georgia

The proposed project would construct a ten-foot to twelve-foot wide Multi-Use Trail. The trail would travel generally in a northeasterly direction. The project length would be approximately 6.56 miles.

Muscogee 2005
3266 Silliman, Garrett W., Pietak, Lynn Marie Phase I Archaeological Survey of Intersection Improvements to Bell Road at Rogers Circle, Fulton County, Georgia

The proposed project would consist of the realignment of the intersection of Bell Road and Rogers Circle Road in Fulton County, Georgia.

Fulton 2005
3268 Silliman, Garrett W., Pietak, Lynn Marie Phase I Archaeological Survey of Instersection Improvements to SR 81 at New Hope and Keys Ferry Roads, Henry County, Georgia

The first proposed project would consist of the signalization of an existing stop condition intersection at SR 81 and Keys Ferry Road in Henry County.

Henry 2005
3269 Silliman, Garrett W., Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of the Grimes Bridge Road Creek Project Area, Fulton County, Georgia

The proposed project would reconstruct the existing bridge on Grimes Bridge Road over Big Creek on the existing alignment.

Fulton 2005
3282 Silliman, Garrett W., Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of SR 27/US 280 over Lanahassee Creek, Webster County, Georgia

The design plans have been revised and the project length is now approximately 2,727 feet. This represents a reduction in project length of approximately 13 feet. The proposed bridge would be 235 feet long and 44 feet wide. The previous CE and Reevaluation proposed a 200-foot long bridge.

Webster 2005
3440 Banguilan, Alvin J., Silliman, Garrett W. Phase I Archaeological Survey of SR11/US41 from SR49 to Houston Road, Houston and Peach Counties, Georgia

This GDOT Archaeological Report Short Form for Negative Findings entitled Phase I Archaeological Survey of SR11/US41 from SR49 to Houston Road, Houston and Peach Counties, Georgia was conducted in December 2005.The proposed project would make improvements along SR 49/SR 11 /US 41 in Houston and P

Houston 2005
3452 Silliman, Garrett W., Pietak, Lynn Marie Phase I Archaeological Survey of the Proposed SR 324 Widening Project Area, Gwinnett County, Georgia

On May 25th and 26th, 2005, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey for the proposed widening of SR 324 near the town of Hog Mountain, Georgia.

Gwinnett 2005
3473 Banguilan, Alvin J., Silliman, Garrett W. Phase I and II Archaeological Investigations of the Proposed Ball Street Extension, Houston County, Georgia

During April, July, and November 2005, Edwards-Pitman Environmental, Inc. (EPEI) conducted Phase I and II archaeological investigations at the proposed Ball Street extension location, Perry, Houston County, Georgia.

Houston 2005
3622 Silliman, Garrett W., Pietak, Lynn Marie Phase I Archaeological Survey of the Proposed South Lake C-Tran Bus Transfer Facility Project Area, Clayton County, Georgia

In May 2006, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed South Lake C-Tran Bus Transfer Facility project area.

Clayton 2006
Displaying 31 - 40 of 104