3201
|
Banguilan, Alvin J., Silliman, Garrett W.
|
Phase I Archaeological Survey of the Battle Creek Road and Mt. Zion Boulevard Roadway Improvements, Clayton County, Georgia
|
Report short form for negative findings for Phase I Archaeological Survey of the Battle Creek Road and Mt. Zion Boulevard Roadway Improvements, Clayton County, Georgia. The project is located on the Jonesboro Quadrangle.
|
Clayton
|
2005
|
3265
|
Banguilan, Alvin J., Silliman, Garrett W.
|
Phase I Archaeological Survey of Warm Springs Road Bike Trail, Muscogee County, Georgia
|
The proposed project would construct a ten-foot to twelve-foot wide Multi-Use Trail. The trail would travel generally in a northeasterly direction. The project length would be approximately 6.56 miles.
|
Muscogee
|
2005
|
3266
|
Silliman, Garrett W., Pietak, Lynn Marie
|
Phase I Archaeological Survey of Intersection Improvements to Bell Road at Rogers Circle, Fulton County, Georgia
|
The proposed project would consist of the realignment of the intersection of Bell Road and Rogers Circle Road in Fulton County, Georgia.
|
Fulton
|
2005
|
3268
|
Silliman, Garrett W., Pietak, Lynn Marie
|
Phase I Archaeological Survey of Instersection Improvements to SR 81 at New Hope and Keys Ferry Roads, Henry County, Georgia
|
The first proposed project would consist of the signalization of an existing stop condition intersection at SR 81 and Keys Ferry Road in Henry County.
|
Henry
|
2005
|
3269
|
Silliman, Garrett W., Pietak, Lynn Marie
|
Addendum to Phase I Archaeological Survey of the Grimes Bridge Road Creek Project Area, Fulton County, Georgia
|
The proposed project would reconstruct the existing bridge on Grimes Bridge Road over Big Creek on the existing alignment.
|
Fulton
|
2005
|
3282
|
Silliman, Garrett W., Pietak, Lynn Marie
|
Addendum to Phase I Archaeological Survey of SR 27/US 280 over Lanahassee Creek, Webster County, Georgia
|
The design plans have been revised and the project length is now approximately 2,727 feet. This represents a reduction in project length of approximately 13 feet. The proposed bridge would be 235 feet long and 44 feet wide. The previous CE and Reevaluation proposed a 200-foot long bridge.
|
Webster
|
2005
|
3440
|
Banguilan, Alvin J., Silliman, Garrett W.
|
Phase I Archaeological Survey of SR11/US41 from SR49 to Houston Road, Houston and Peach Counties, Georgia
|
This GDOT Archaeological Report Short Form for Negative Findings entitled Phase I Archaeological Survey of SR11/US41 from SR49 to Houston Road, Houston and Peach Counties, Georgia was conducted in December 2005.The proposed project would make improvements along SR 49/SR 11 /US 41 in Houston and P
|
Houston
|
2005
|
3452
|
Silliman, Garrett W., Pietak, Lynn Marie
|
Phase I Archaeological Survey of the Proposed SR 324 Widening Project Area, Gwinnett County, Georgia
|
On May 25th and 26th, 2005, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey for the proposed widening of SR 324 near the town of Hog Mountain, Georgia.
|
Gwinnett
|
2005
|
3473
|
Banguilan, Alvin J., Silliman, Garrett W.
|
Phase I and II Archaeological Investigations of the Proposed Ball Street Extension, Houston County, Georgia
|
During April, July, and November 2005, Edwards-Pitman Environmental, Inc. (EPEI) conducted Phase I and II archaeological investigations at the proposed Ball Street extension location, Perry, Houston County, Georgia.
|
Houston
|
2005
|
3622
|
Silliman, Garrett W., Pietak, Lynn Marie
|
Phase I Archaeological Survey of the Proposed South Lake C-Tran Bus Transfer Facility Project Area, Clayton County, Georgia
|
In May 2006, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed South Lake C-Tran Bus Transfer Facility project area.
|
Clayton
|
2006
|