Back to top

Alston, Robert L.

Report Number Author(s) Title Abstract Summary County Year
8322 Alston, Robert L. F-093-1(4), Colquitt County- Moultrie Bypass Clearinghouse Doc. No. 71-11-30-11

As a part of the negative declaration update for this portion of the Moultrie Bypass, an archaeological assessment was made. The entire project is in an urbanized area with the exception of the land adjacent to Kapilco Creek.

Bibb 2014
8420 Alston, Robert L. Clearinghouse Doc. Project Numbers 76-10-13-17 and 76-10-13-18

As a part of the A-95 review process, an archaeological assessment of these two projects was made. 76-10-13-17 involves the construction of a district office in DeKalb County.

Gilmer 2011
8679 Alston, Robert L. M-9078 & RS-1319(5) Fulton - Clearinghouse Doc. No•s. 75-07-30-11; 75-07-30-13

The site files at Georgia State University had no sites recorded in the vicinity of the project. The alignment was plotted on the Riverdale U.S.G.S. topographic map and aerial photography in order to predict areas of site probability.

Fulton 2011
8694 Alston, Robert L. M-9095(1), Fulton County-Clearinghouse Doc. No. 77-01-20-19

The project area was surveyed by a simple visual inspection. The project area is urban with residential and commercial properties on the west side of Virginia Avenue and predominantly commercial property on the east side.

Cobb 2014
8704 Alston, Robert L. RS-1879(4) Coffee; CCN 76-01-27-03

This project is the improvement and paving of an 11 mile portion of S.R. 107 from U.S. 441 to the Coffee/Jeff Davis County line. S.R. 107 is presently unpaved. The improvements include widening to two lanes and some straightening of curves (see map).

Banks 2013
8707 Alston, Robert L. RF-114-1(19) Fulton; Clearinghouse Doc. No. 77-01-17-02

This project involves the widening of Alpharetta Street in Roswell from Canton Street to Holcomb Bridge Road. The road would be widened from two and three lanes to five lanes. Eighty-six feet of right-of-way would be needed, and existing right-of-way varies between 50 and 80 feet.

Franklin 2011
10629 Alston, Robert L. Project HHS-009-2(47), Chatham County

Project HHS-009- 2(47), Chatham County

Chatham 1979
10850 Alston, Robert L. Archaeological Clearance of District Bridge Projects, BRSLB-2795(1)

Abstract 10850

In compliance with Section 106 of the National Historic Preservation Act of 1966, the following Georgia DOT projects were surveyed for cultural resources:

Harris 1979
11084 Alston, Robert L. Archaeological Survey of Bridge Replacement Projects, RS-1360(3), Gilmer County

Because the projects are in-place, no new areas will be impacted. For this reason no archaeological field inspection is necessary and the archaeological resources of the State will not be affected. RS-1360 (3) Coosawattee River Bridge on SR 282 - Existing bridge is to be retained and widened.

Gilmer 1980
11100 Alston, Robert L. Archaeological Clearance of District Project, F-034-1(12), Lowndes

In compliance with Section 106 of the National Historic Preservation Act of 1966, Georgia DOT Project F-034-1(12) was subjected to an archaeological survey intended to locate sites either on, or that could be considered eligible for nomination to the National Register of Historic Places.

Lowndes 1979
Displaying 11 - 20 of 67