Alston, Robert L.

Report Number Author(s) Title Abstract Summary County Year
12622 Alston, Robert L. Archaeological Clearance of District Bridge Projects (BRZLB-045(1)), Carroll County

McKenzie Bridge Road - Bridges and approaches over Little Tallapoosa River near Carrollton, Georgia. Replace existing 69' x 15' timber bridge with a 216' x 44' concrete bridge. The concrete bridge will be built on new location to provide safer approaches to the crossing.

Carroll County, GA 1979
12623 Alston, Robert L. Bridge Replacements and 404 Permit Requests, District Six (BRZLB-0227(4)), Pickens County

Location -Tributary crossing County Road No. 32 east of the community of Marble Hill and north of State Route 53 in Pickens County.  Purpose -Replace existing bridge with a Double 101 x 81 concrete bridge culvert.

Pickens County, GA 1979
12626 Alston, Robert L. Archaeological Assessment of Project BRZLB-011(1), Banks County

Grove Creek crossing on County Road 52 between Maysville and Horner, Georgia.  Replace existing 107' x 13' wood bridge with 170' x 36' concrete bridge on new alignment.

Banks County, GA 1979
12657 Alston, Robert L. Archaeological Survey of Bridge Replacement Project BHF-082-1(14) Murray County

The bridge replacement project BHF-082-1(14) located in Murray County will be constructed or widened along the existing alignment. Because the projects are in-place, no new areas will be impacted.

Murray County, GA 1980
12709 Alston, Robert L. Project F-026-1(24) Dougherty County Clearinghouse Doc. No. 76-11-10-15

Project F-026-1(24) located in Dougherty County was surveyed by simple visual inspection. The project area is urban with both commercial and residential property along its length. The proposed widening will require 19 feet (5.8 meters) of additional right-of-way.

Dougherty County, GA 1977
12766 Alston, Robert L. Bridge Replacements and 404 Permit Request District Six BRZLB-0047(1) Catoosa County

This is a bridge project, BRZLB-0047(1), located in Catoosa County. Survey techniques included visual inspection, pedestrian survey, and subsurface testing where necessary. The two asterisked (*) projects encountered archaeological material; these require further testing or excavation.

Catoosa County, GA 1979
12769 Alston, Robert L. Archaeological Survey of Project FH-002-1(1) Rabun County

In response to a request from our District One office, an archaeological survey of three bridge replacements was conducted by the Archaeologist attached to the Environmental Analysis Bureau.

Rabun County, GA 1976
12822 Alston, Robert L. Bridge Replacements and 404 Permit Requests District Six BRS-0810(10) Fannin County

In compliance with Section 106 of the National Historic Preservation Act of 1966, the following bridge projects were surveyed for archaeological material: Project BRS-0810(10) located in Fannin County.

Fannin County, GA 1979
12919 Alston, Robert L. Ambient Noise Predictions and Air Quality Impact Analysis, RF-026-1(28), Lee-Terrell Counties

Subject project consists of widening a two (2) lane paved fac11fty to a four (4) lane paved facility with some areas having five (5) lanes. Total length of project is approximately 16.50 miles.

Please attention your findings to the environmental section as soon as possible.

Lee County, GA 1978
13039 Alston, Robert L. Project APL-8015(1) Douglas County, Clearinghouse Number 74-06-05-06

Project APL-8015(1) is a locate in Douglas County and involves road work on Burnt Hickory and McIntosh Roads. The project is near Lithia Springs, Georgia.

Douglas County, GA 1976
Displaying 41 - 50 of 67