Back to top

Anderson, Nain E.

Report Number Author(s) Title Abstract Summary County Year
8658 Anderson, Nain E. RS-2005, Fulton; Clearinghouse Doc. No. 76-07 -08-11

Location: This project involves the construction of a full diamond interchange at 1-85 and Flat Shoals Road near Union City. Additional right-of-way will be required for the four ramps and realignment of

one dead end frontage road.

Method of Survey:

Oglethorpe County, GA 2013
8663 Anderson, Nain E. FF-165-1(1) , Fulton County ; Clearinghouse Doc . No . 76-11-02- 02

Project: FF-165-1(1), Fulton County; Clearinghouse Doc. No. 76-11-02-02.

Gordon County, GA 2010
8668 Anderson, Nain E. RS-0867(7) Fulton; Clearinghouse Doc. No. 75-07-30-10.

Location: The project involves the widening of Jonesboro Road from Goodson Road to Bethsaida Road. The section from Goodson to Oakely Road will be a 5 lane urban section, and the section from Oakley to Bethsaida Road will be a 4 lane rural section.

Wayne County, GA 2007
8681 Anderson, Nain E. A parcel of land adjoining Niskey Lake Road, bisected by Brooks Road covering 43.5 acres.

The project will involve construction of a Middle School with various playing fields on a tract of land which is presently under pines and mixed hardwoods of a 30 to 40 year growth. The G.S.U.

Cherokee County, GA 2015
11789 Anderson, Nain E. Archaeological Assessment of RF-005-1(4), Troup County

The project involves the widening of S.R. 18 in West Point from U.S. 29 east to 1-85 from two to four lanes. No additional right-of-way will be purchased.

Troup County, GA 1977
12047 Crawford, Peggy L., Anderson, Nain E. M-0026(2), Clayton, Clearinghouse Doc. No. 74-03-19-06

This project involves widening Jonesboro Road from 2 and 3 lanes to 4 and 5 lanes. The area the project is concerned with is north from I-75 to Forest Parkway. A maximum of 50 feet of additional right-of-way will be required.

Clayton County, GA 1977
12107 Anderson, Nain E. Archaeological Survey Report of APL-8019(1), Carroll County

This project involves the construction of a two lined facility from the intersection of S.R. 61 and U.S. 78 north .83 miles. The study corridor continues to S.R. 101. 300 feet of right-of-way will be needed. The construction will be on the right side of the right-of-way. No sites were located.

Carroll County, GA 1977
12332 Anderson, Nain E., McMichael, Alan E. Archaeological Survey Report, F-025-1(24), Dougherty County

The project was surveyed by simple visual inspection. The project area is urban with both commercial and residential property along its length. The proposed widening will require 19 feet (5.8 meters) of additional right-of-way.

Dougherty County, GA 1977
12889 Anderson, Nain E. Archaeological Survey Report Project F-158-1(2) Harris County

Project F-158-1(2), Harris County; C.C.N. 77-10-07-04: This project involves the replacement of the present steel truss bridge over Mountain Oak at Lick Skillet Road in Harris County. The new bridge will be to the east of the Old bridge.

Harris County, GA 1977
12915 Anderson, Nain E. Archaeological Survey Report for Project I-85-1(52)00 Harris County

Project 1-85-1(52)00, Harris; C.C.N. 77- 07- 25-28 involves the construction of a rest stop and tourist information center on a parcel of land south of the eastbound lane of 1-85 just east of the Alabama-Georgia State line.

Harris County, GA 1977
Displaying 31 - 40 of 41