1872
|
Hamby, Theresa M.
|
Phase I Archaeological Survey of Tucker Road, Macon
|
Approximately 1.96 miles of Tucker Road was subjected to Phase I Archaeological Survey by New South Associates on January 26, 1999. The survey studied the portion of Tucker Road lying between Foster and Rivoli Roads in Macon, Bibb County, Georgia.
|
Bibb
|
1999
|
1884
|
Hamby, Theresa M.
|
Addendum to the Phase I Archaeological Survey of Five Proposed Bridge Replacements, Coweta County, Georgia
|
The original survey of five bridge replacements was conducted by New South Associates on July 8, 1996. The survey covered a 1,000 foot approach on either side of each bridge and a total 120 feet of right-of-way at the bridges.
|
Coweta
|
1999
|
1893
|
Joseph, Joseph W., Watts-Edwards, Matthew J., Hamby, Theresa M.
|
Phase I Archaeological Survey of the Proposed Sewer Line Along I-75, Monroe and Bibb Counties, Georgia
|
New South Associates conducted a Phase I Archaeological Survey of the proposed sewer/water line along Interstate 75 in Monroe and Bibb Counties, Georgia. The survey of the approximately 9.7 mile corridor was conducted between June 7 and 9, 1999.
|
Bibb
|
1999
|
1949
|
Hamby, Theresa M.
|
Phase I Archaeological Survey of the Proposed Social Circle Bypass and Connector Road, Walton County, Georgia
|
A Phase I archaeological survey of an approximately 2.5 mile long bypass around Social Circle and a 3,800 foot connector road was conducted August 31 and September 1, 1999. The bypass has 200 feet of proposed right-of-way, while the connector road has only 100 feet.
|
Walton
|
2000
|
1981
|
Joseph, Joseph W., Hamby, Theresa M.
|
Phase I Archaeological Survey of the 1-75/Eagles Landing Interchange Henry County, Georgia
|
On December 8, 1999 and March 6, 2000, New South Associates conducted a Phase I archaeological survey of the proposed I-75/Eagles Landing interchange improvements in Henry County, Georgia.
|
Henry
|
2000
|
1982
|
Joseph, Joseph W., Hamby, Theresa M.
|
Phase I Archaeological Survey of the Forsyth County Frontage Road Forsyth County, Georgia
|
New South Associates conducted a Phase I archaeological survey of the new alignment for the Forsyth County Frontage Road on March 8, 2000.
|
Forsyth
|
2000
|
1983
|
Fredericksen, Brody K., Hamby, Theresa M.
|
Phase I Archaeological Survey of the Proposed US 23/Plesant Hill Road Interchange, Gwinnett County, Georgia
|
New South Associates conducted a Phase I archaeological survey of the proposed U.S. 23/Pleasant Hill interchange on March 22, 2000. The right of way encompasses approximately 1500 feet of U.S.
|
Gwinnett
|
2000
|
1985
|
Watts-Edwards, Matthew J., Hamby, Theresa M.
|
Phase I Archaeological Survey of the Glenridge Drive Widening Fulton County, Georgia
|
New South Associates conducted a Phase I Archaeological Survey of the proposed widening of Glenridge Drive, Fulton County, Georgia. The survey of the project area along Glenridge Drive, approximately 1.1 miles from Roswell Road, was conducted on August 31, 1999.
|
Fulton
|
2000
|
2009
|
Hamby, Theresa M.
|
Phase I Archaeological Survey of Ocmulgee East Corridor Improvements, Bibb County, Georgia
|
New South Associates conducted a Phase I archaeological survey of the Ocmulgee East road improvements and widening, Bibb County, Georgia on October 22 and 23, 1998.
|
Bibb
|
2000
|
2014
|
Hamby, Theresa M., Loubser, Johannes H. N.
|
Phase I Archaeological Survey of the Proposed Winder Bypass, Barrow County, Georgia
|
New South Associates conducted a Phase I archaeological survey of the proposed eastern bypass of the city of Winder in Barrow County Georgia. The study corridor encompassed 5.5 miles of 250 to 300 feet of right-of-way along existing roads and new location.
|
Barrow
|
2000
|